My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_1991-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2024 11:37:26 AM
Creation date
6/3/2020 9:57:28 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991-2008
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_1991-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
551
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,J 2002 Page of <br /> 6. PIEPING SUNIP TESTING <br /> Test Method Developedy: 0 Sump Manufacturer IM Industry Standard U ProfessionalEngineer <br /> UOdier(Spwify) <br /> Test Method U Vacuum W Hydrostatic <br /> UOther( ) <br /> Test Equipment-Used: S nt 'on:2.101 <br /> SEEN <br /> MEN= imp#1 Sump#2 Sump# <br /> Sump Diameter: 42" 42" 4 " <br /> Sump Depth: " 38" <br /> Sump Material: Plastic Phutic Plastic <br /> Height m Tank Top to Top of 17" 1 " 1 <br /> Piping Penetration: <br /> Height from Tank Top to Lowest 22" 1 " 13" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested' " <br /> turbineDoes shut down when <br /> sump r detects liquid(b Yes IM No E3 NA QYes IM No E3 NA OYes Q No UNA UYes E3 No U NA <br /> product and ?` <br /> Turbine shutdown responsee <br /> Is system ed for fail-safe No UNA 0 Yes IM No E3 NA, Wes El No ONA Wes E3 No Q NA <br /> shutdown?* <br /> Was fail-safe v to Yes No NA Yes No NA Yes A Lloperational?* <br /> No LINA <br /> Watt e between applymg <br /> pressurelvaoxmAvater and gating 10 min. 10 Min. 10 <br /> Test Start Time: 10:33 11:31 12:02 <br /> Initial Reading 5.56%" 6.6483" 4.9241" <br /> Test End Time: 10:53 11: 12:18 <br /> Final Reading ): 5.5704" 6.6479" 4.9238" <br /> Test Duration: 15 min. is min. 16 mhL <br /> Change in +.0008" " " <br /> Threshold or Criteria: " " .002" " <br /> F <br /> Was sensor <br /> removed for ? IM Yes Q No 13 NA OYes 13 No 13 NA 11 Yes LIM Q NA Dyes E3 No ONA <br /> sensorWas propedy replaced and M Yes 0 No ONA MYes CM U NA MYes Q No E3NA Yes Ll No 13NA <br /> verified fimchonalt n <br /> Comments—LvEhtde gimmadon on reptun made prior tot ` e ®1 - ai ) <br /> Systein prograrainedfora e with UDC Sensors and Beaudrean System but not through TLS-250 <br /> 'If the entire depth of the sump is not tested,specify how much was tested. Ifthe answer to my of the questions <br /> asterisk( )is or A7,the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.