Laserfiche WebLink
D. Results of Testhag/Scrvidag <br /> Software Version Installed: <br /> Complete the following checklist: <br /> 0 Yes L3 No* Is the audible alarm operational? <br /> ES <br /> Yes L3 No* Is the visual alarm operational? <br /> J4 Yes Q No* Were all sensors visually inspected, functionally tested,and confirmed operational? <br /> JU Yes Q No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> U Yes U No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem—) <br /> W N/A operational? <br /> Q Yes Eff No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> Ll N/A monitoring system detects a leak, fails to operate, or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply) U Sump/Trench Sensors; U Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection? Q Yes; 0 No. <br /> LJ Yes ® .No* For tank systems that utilize the monitoring tormg system as the primary tank overfill warning device (i.e. no <br /> N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> AZ AP 46 le fill point(s)and operating properly? If so,at what percent of tank capacity does the alarm trigger? <br /> L3 Yes* ZI No Was any monitoring equipment replaced? If yes, identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all replacement parts in Section E,below. <br /> U Yes' A No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) U <br /> Product; U Water. If yes,describe causes in Section E,below. <br /> J&Yes Ll No* Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports, if Mplicable <br /> W—Yes Q No* Is all monitoring equipment 2perational per manufacturer's specifications? =J <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments:-5'1-rC W45 -4A1WaAL_ ee IV,6 7WS rt Al* <br /> Page 2 of 3 03/01 <br />