Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment. V, Check this boy if tank gauging is used only for•inventory control. <br /> Q Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the folio ing checklist: <br /> 0 Yes Q No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Ll Yes Q No* Were all tank gauging probes visually inspected for damage andresiduebuildup? <br /> Ll Yes Ll No* Was accuracy of system product level readings tested? <br /> U Yes U No* Was accuracy of system water level readings tested? <br /> U Yes U No* Were all probes reinstalled properly? <br /> D Yes,.-e I U No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): Q Ch this box if LLDs are not in—stalled. <br /> Complete the follo ing checklist: )711K <br /> U Yes 0 No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> U N/A (Check all that apply) Simulated leak rate: L13 g.p.h.; Ll 0.1 g.p.h; 0 0.2 g.p.h. <br /> Ll Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> i7 �4 <br /> w,, <br /> L3 Yes I U No* Was the testing apparatus properly calibrated? <br /> 0 Yes Q No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> U N/A <br /> Q Yes Ll No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> Ll N/A I <br /> Ll Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> Q N/A or disconnected? <br /> 0 Yes L3 No* For electronic LLDs,does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br /> L3 N/A or fails a test? <br /> U Yes 13 No* For electronic LLDs,have I ve all accessible wiring connections been visually inspected? <br /> Q N/A <br /> if 0 Yes Ll No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Page 3 of 3 03/01 <br />