My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:00:21 PM
Creation date
6/3/2020 9:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
hazardous substances for the maximum anticipated period of time necessary for <br />the recovery of any released hazardous substances." <br />Corrective Action: Secondary containment testing was last performed on 1-5- <br />06 for UDC#5/6 and was due by January 2009. Testing has not been completed <br />and is 17 months past due. Secondary containment testing is required once <br />every 36 months. Immediately schedule this test and provide 48 hours <br />notification to the EHD. <br />A fuel leak was found at the 87 product line. All primary containment must be <br />product tight. Immediately discontinue use of failed piping and have a properly <br />licensed, trained, and certified contractor replace or repair the failed piping under <br />permit and inspection of the EHD. If the failed component can't be replaced <br />immediately, there is a possibility that the 87 UST system may be red tagged to <br />prevent fuel inputs. <br />The 1-30-09 secondary containment test results indicate a failure at the 91 <br />product line. All secondary containment for the UST system must be tight. <br />Immediately have a properly licensed, trained, and certified contractor repair or <br />replace the failed component(s) under permit and inspection of the EHD. <br />Please be advised that failure to correct the violation will cause <br />continuing/additional violations and may result in further legal action. <br />If you have any questions, please contact Aris Cacapit, RENS, at (209) 468- <br />3453. <br />IM4171063', <br />Aris Cacapit, REHS <br />Underground Storage Tank Program <br />
The URL can be used to link to this page
Your browser does not support the video tag.