Laserfiche WebLink
10 4 <br />San Joaquin County <br />DIRECTOR <br />..coG Environmental Health Department <br />Donna Heran, RENS <br />�o. �• <br />ASSISTANT DIRECTOR <br />2' ? 600 East Main Street <br />Laurie Cotulla, REHS <br />Stockton, California 95202-3029 <br />PROGRAM COORDINATORS <br />•' <br />Carl Borgman, REHS <br />Website: www.s ov.or /ehd <br />4�/FpR� �g g <br />Mike Huggins, REHS, RDI <br />Margaret Lagorio, REHS <br />Phone: (209) 468-3420 <br />Robert McClellon, REHS <br />Fax: (209) 464-0138 <br />.teff Carruesco, REHS, RDI <br />Kasey Foley, REHS <br />February 4, 2009 <br />Kim White <br />Elite 4 Contractors, Inc. <br />2535 Wigwam Dr. <br />Stockton, CA 95205 <br />Fax: (209) 461-6342 <br />RE: Bill's 76 633 E. Victor Rd. Lodi CA 95240 (SR0056356) <br />The San Joaquin County Environmental Health Department (EHD) has completed the review of <br />the permit application to perform an ISD/EVR phase II upgrade/cold start. The permit has been <br />approved with the following conditions. <br />Conditions of approval: <br />1. Contact the local fire department, local planning or building department and the San <br />Joaquin Valley Air Pollution Control District for any applicable permits. <br />2. Any changes shall be submitted to the San Joaquin County Environmental Health <br />0 -Department (EHD) for approval prior to commencing work. All new addenda <br />supercede the previous ones. <br />3. All components must be certified by an independent testing organization and labeled as <br />required by the organization. (UL, ULC, ANSI, API, ASTM, etc. See California Code of <br />Regulations (CCR), Title 23 Chapter 16 Table B for complete list). The component must <br />bear the appropriate mark as required by the independent testing organization. <br />4. Before the alarm history is cleared by the "cold start", a current printout must be <br />created and available for EHD inspection. Inspection may occur during the monitoring <br />system functionality test. <br />5. Qualified service technicians must possess or work under the direct and personal <br />supervision of an individual physically present at the work site who possesses all of the <br />following: <br />a. One of several permissible valid, current contractor's licenses issued by the <br />Contractors State License Board (may be issued to the installation company), and <br />b. All valid, current California UST certificates issued by the International Code <br />Council (ICC), that are applicable to the work being performed, and <br />c. A valid, current certificate of training from the manufacturer(s) of the <br />component(s) being tested, repaired, or serviced; <br />d. Each person installing or testing any component must hold a certificate of <br />training from the manufacturer of that component. <br />Page 1 of 2 <br />