My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
633
>
2300 - Underground Storage Tank Program
>
PR0232519
>
COMPLIANCE INFO_2009-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/3/2024 2:00:21 PM
Creation date
6/3/2020 9:57:37 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2015
RECORD_ID
PR0232519
PE
2361
FACILITY_ID
FA0000483
FACILITY_NAME
BILLS 76
STREET_NUMBER
633
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
04321055
CURRENT_STATUS
01
SITE_LOCATION
633 E VICTOR RD STE A
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232519_633 E VICTOR_2009-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
384
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RE: Bill's 76 633 E. Victor Rd. Lodi CA 95240 (SR0056356) <br />6. Contact Aris Cacapit (468-3453) to arrange the following inspection(s) (a 48-hour notice <br />is required): <br />a. The EHD must witness the functionality of the monitoring system to ensure that <br />monitoring has been restored to meet the requirements of California Code of <br />Regulations Title 23 and the Health & Safety Code. <br />7. If concrete is broken near the UST, a tank secondary containment test must be performed <br />by a SWRCB licensed tank tester in accordance with the manufacturer's guidelines. <br />Results must be received by the EHD within seven days of returning the facility to <br />operating condition. <br />8. If concrete is broken near the product lines, a line secondary containment test must be <br />performed by a SWRCB licensed tank tester in accordance with the manufacturer's <br />guidelines. Results must be received by the EHD within seven days of returning the <br />facility to operating condition. <br />9. If electrical penetration is added to UDC or sump, a 24 hour lake test or its equivalent <br />will be required to be witnessed by this office. <br />10. An "Underground Storage Tank Certification of Installation/Modification" form (form C) <br />shall be submitted by the owner or the owners' agent [pursuant to (CCR) 2635(d)] before <br />this upgrade will be considered complete by EHD. <br />11. Permit expires 180 days from date of approval. If an extension to the expiration date is <br />required, a written request must be submitted to the EHD prior to the expiration date. <br />Thank you, <br />Ak�s 7�— <br />Aris Cacapit, a <br />Environmental Health Specialist <br />600 E. Main St. <br />Stockton, CA 95202 <br />(209) 468-3453 desk <br />(209) 468-3433 fax <br />acacapit@sjcehd.com <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.