Laserfiche WebLink
Page 4 of 9 <br /> 1. PIPING SUMP TESTING <br /> Test Method Developed By: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Sump#87 Sump# 89 Sump# 91 Sump# <br /> Sump Diameter: 48" 48" 48" <br /> Sump Depth: 75" 75" 76" <br /> Sump Material&Manufacturer: Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 12" 12" 12" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 32" 32" 32" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Fair Fair Fair <br /> Portion of Sum Tested' 2"Above highest 2"Above highest 2"Above highest 2"Above highest <br /> Sump penetration penetration penetration penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?` El Yes ElNo®NA ❑Yes ElNo®NA ❑Yes ElNo®NA [:1 Yes ElNo®NA <br /> Was fail-safe verified to be <br /> op erational?" [_1 Yes[INo®NA [:]Yes[:]No®NA ❑Yes❑No®NA [:1 Yes❑No®NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 10:32am 10:24am 10:42am <br /> Initial Reading(RI): 3.0892 0.5375 0.7251 <br /> Test End Time: 10:47am 10:39am 10:57am <br /> Final Reading(RF): 3.0899 0.5373 0.7251 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-R,): 0.00074 0.00021 0 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> MENEM <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and <br /> ®Yes <br /> verified functional after testi <br /> ? [-INo F1 NA ®Yes[:1 No[_1 NA ®Yes El No F1 NA ®Yes❑No El NA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />