My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2011-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2015
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232534_1960 W ELEVENTH_2011-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 5 of 9 <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ®Industry Standard ❑Professional Engineer <br /> Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: See attached testing procedures. Equipment Resolution: <br /> UD7#172 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer: <br /> UDC Material: Fiber lass Fiberglass Fiberglass Fiberglass <br /> UDC Depth: 30" 30" 30" 30" <br /> Height from UDC Bottom to Top 9" 9" 9" 9" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 5" 5" 5" 5" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to <br /> Fair Fair Fair Fair <br /> testing: <br /> Portion of UDC Tested Above highest Above highest Above highest Above highest <br /> penetration penetration penetration penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes ❑No®NA ❑Yes❑No®NA ❑Yes ❑No®NA ❑Yes ❑No®NA <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes ❑No <br /> safe shutdown?" ®NA [-]Yes[-]No®NA [:1 Yes [:1 No®NA El Yes El No®NA <br /> Was fail-safe verified to be ®NA ❑Yes ®No®NA ❑Yes ❑No®NA <br /> op erational?* <br /> ❑Yes ❑No®NA ❑Yes®No <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test <br /> Test Start Time: 1:07pm 1:07pm 12:41pm 1:07pm <br /> Initial Reading(RI): 4.9696 4.8924 4.0321 4.9734 <br /> Test End Time: 1:22pm 1:22pm 12:56pm 1:22pm <br /> Final Reading(RF): 4.9701 4.8924 4.0327 4.9738 <br /> Test Duration: 15 min 15 min 15 min 15 min <br /> Change in Reading(RF-RI): 0.00048 0 0.00068 0.00043 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Was sensor removed for testing? ®Yes❑No❑NA ®Yes❑No❑NA ®Yes[-]No❑NA ®Yes❑No❑NA <br /> Was sensor properly replaced and ®yes❑No❑NA ®Yes®No❑NA ®Yes❑No❑NA ®Yes❑No❑NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> i If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.