Laserfiche WebLink
4 <br /> D.Results of Testing/Servicing <br /> Software Version Installed: 329.01 <br /> Complete the following checklist: <br /> E Yes r No* Is the audible alarm operational? <br /> F. Yes r No* Is the visual alarm operational? <br /> * Yes r No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes f" No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with <br /> heir ro er o eration? <br /> * Yes r No* f alarms are relayed to a remote monitoring station,is all communications equipment(e.g.modem)operational? <br /> Ir N/A <br /> ITO Yes r No* b1stern <br /> r pressurized piping systems,does the turbine automatically shut down if the piping secondary containment monitoring <br /> N/A detects a leak,fails to operate,or is electrically disconnected?If yes:which sensors initiate positive shut-down?(Check <br /> /l that apply)Fe Sump/Trench Sensors; r Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due to leaks and sensor failure/disconnection?0 Yes; r No <br /> Yes r No* or tank systems that utilize the monitoring system as the primary tank overfill warning device(i.e.no mechanical overfill <br /> prevention valve is installed),is the overfill warning alarm visible and audible at the tank fill point(s)and operating properly?If <br /> /' N/A o at what percent of tank capacity does the alarm tri er?% <br /> * Yes* r No Nas any monitoring equipment replaced?If yes,identify specific sensors,probes,or other equipment replaced and list the <br /> manufacturer name and model for all replacement parts in Section E below. <br /> ` Yes* w No Alas liquid found Inside any secondary containment systems designed as dry systems?(Check all that apply) <br /> Product r Water.If yes,describe causes in Section E below. <br /> • Yes " No. Was monitoring system set-up reviewed to ensure proper settings?Attach set up reports,if applicable <br /> • Yes ('' No* s all monitoring equipment operational per manufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E.Comments: <br /> replaced the battery on the veeder root console <br /> Monitoring System Certification Page 2 of 3 12/47 <br />