Laserfiche WebLink
Page 1 of 1 <br /> SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Fill Riser Containment Sumps r <br /> Fill Riser Containment Sumps are Present, but were Not Tested r <br /> Test Method Developed By: r Spill Bucket Manufacturer fo Industry Standard Professional Engineer <br /> r Other(Specify): <br /> Test Method Used By: r Pressure !o Vacuum f Hydrostatic <br /> r Other(Specify): <br /> Test Equipment Used:(VACUUM TEST Equipment Resolution: <br /> Spill Box# Spill Box# Spill Box <br /> Tank Ti SUPREME Tank T2 PLUS Tank T3 REGULAR Spill Box# <br /> Fill-Direct Fill-Direct Fill-Direct` <br /> Bucket Diameter. 12.00 12.00 12.00 <br /> Bucket Depth: 12.00 12.50 12.50 <br /> Wail time between applying <br /> pressuralvacuun/water and staling test 1 m I n 1 min 1 min min <br /> Test start Time: 10:46:00 10:48:00 10:56:00 <br /> Initial Reading M: 30.00 PSI 30.00 PSI 30.00 PSI <br /> Test End 10:47:00 10'49:00 10:57:00 <br /> Final Reading try: 30.00 PSI 30.00 PSI 30.00 PSI <br /> Test Duration: 1 min 1 m i n 1 m i n <br /> Change in Readingkn.w: 0.00 PSI 0,00 PSI 0.00 PSI <br /> PasslFail Threshold or Criteria; +/-4.00 +1-4.00 +1-4.00 <br /> Test Result. Pass Pass Pass <br /> Comments?(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> WO:2309192 <br />