Laserfiche WebLink
4 ;`= Tanknolo <br /> gY <br /> Emergency Stop (E-Stop / ESO) Periodic Inspection <br /> Facility lnformatiorr Technician Infdrrttation <br /> Site#:201383 Date:2/15/2013 <br /> Address:1960 W.11 TH STREET @ CORRAL HOLLOW Name:Steven Willems�$ <br /> City/State:TRACY CA Technician Signature: <br /> The objective of this test is to provide assurance that the when the E-Stop switch is activated,all the fueling system circuits(turbines,and <br /> dispensers)are de-energized,and remain de-energized until they are re-set manually).The test procedures and guidelines shall be in accordance <br /> with the E-Stop Testing Process. <br /> � 3iTE DATA., <br /> 1 Number of E-Stop switches INSIDE of the building: 1 <br /> 2 Number of E-Stop switches OUTSIDE of the building: 1 <br /> PERFORMANCE DATA Yes No NA <br /> 3 You have added or confirmed that all E-Stop locations are on the Site Diagram t': r r <br /> 4 Do all E-Stops shutdown power to ALL DISPENSERS {o r r <br /> 5 Do all E-Stops shutdown power to ALL STP's {+ r r <br /> 6 Are ALL E-Stops clearly Labeled (; r r <br /> 7 Are the TURBINE BREAKERS clearly identified!labeled ro ( r <br /> POST TEST <br /> 8 All equipment secured and any access ports,lids,enclosures are closed. (: r r <br /> 9 All safety barricades and test equipment has been properly removed fro r r <br /> 10 E-Stop was reset and all dispensing functions are normal (. r r <br /> E-Stop Inspection Results <br /> 11 PASS I FAIL I INCONCLUSIVE <br /> Comments(clearly"describe any deficiencies found) _ <br /> WO:2309192 <br />