Laserfiche WebLink
5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ❑✓ Industry Standard ❑ Professional Engineer <br /> []Other(Spec) <br /> Test Method Used: ✓❑Pressure ❑Vacuum ❑Hydrostatic <br /> El Other(Spec) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: PSI <br /> Piping Run#87 Piping Run#91 Piping Run#Diesel Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Appx 200' Appx 200' Appx 100' <br /> Product Stored: 87 Gas 91 Gas Diesel <br /> Method and location of <br /> piping-run isolation: Clam Sheel Clam Sheel Test Boot in Sump Test Boot in Sump <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: " <br /> Test Start Time: 9:24am 9:24am 9:24am <br /> Initial Reading(RI): 5 PSI 5 PSI 5 PSI PSI <br /> Test End Time: 10:24am 10:24am 10:24am <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI PSI <br /> Test Duration: 1 hour 1 hour 1 hour 1 hour <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 0 <br /> Criteria: <br /> Test Result: 0 Pass ❑Fail ✓❑Pass []Fail ❑✓Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />