Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑✓ Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) inches-1 hr visual test <br /> Test Equipment Used: See attached testing procedures Equipment Resolution:MEE= <br /> Spill Box#87 FB Spill Box#91 FB Spill Box# Diesel FB Spill Box# <br /> Bucket Diameter: 12" 12" 12" <br /> Bucket Depth: 12.5" 12.5" 12.5" <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test: <br /> Test Start Time: 9:02am 9:02am 9:02am <br /> Initial Reading(RI): 12.25 ;n.h--,hr visual Wt 12.0 inches-lhr v—I tas 12,25 n hes-1hr.,u 1 es n nee.,hr Owaln <br /> Test End Time: ffi 10:02am 10:02am 10:02an <br /> Final Reading(RF): 12.25 inches-,hr vlsusl test 12.0 12.25 Inchss 1hr visual test inches-,hrv"t, <br /> Test Duration: 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: ✓❑Pass El Fail ❑✓ Pass ❑Fail ❑✓ Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />