My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2015-2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1960
>
2300 - Underground Storage Tank Program
>
PR0232534
>
COMPLIANCE INFO_2015-2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:57:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2015-2016
RECORD_ID
PR0232534
PE
2361
FACILITY_ID
FA0004547
FACILITY_NAME
CHEVRON STATION #201383
STREET_NUMBER
1960
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23402001
CURRENT_STATUS
01
SITE_LOCATION
1960 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\E\ELEVENTH\1960\PR0232534\RETROFIT 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
447
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDER-DISPENSER CONTAINMENT(UDC)TESTJ_LG . , <br /> Test Method Developed By: ❑UDC Manufacturer [Z]Industry Standard El I"r6fessib n4lEngnle <br /> El Other(Specify) <br /> Test Method Used: E]Pressure El Vacuum JZ1 Hydrostatic <br /> El Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: Inches <br /> UDC# 9/10 UDC# 11/12 UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: Fiberglass Fiberglass <br /> UDC Depth: 36" 36" <br /> Height from UDC Bottom to Top 14" 14" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to N/A N/A <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Fair Fair Fair Fair <br /> testing: <br /> Portion of UDC Tested' Above highest penetration Above highest penetration Above highest penetration Above highest penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both N/A N/A N/A N/A <br /> product and water)?* <br /> Turbine shutdown response time <br /> Is system programmed for fail- ❑Yes []No Z NA OYes ONo RINA 0 Yes 0 No Z NA El Yes El No 21 NA <br /> safe shutdown?* <br /> Was fail-safe verified to be 0 Yes 0 No 2 N El Yes El No 21 NA 0 Yes 0 No [Z]NA El Yes El No 21 NA <br /> o2erationalf <br /> Wait time between applying <br /> pressure/vacuum/water and 15 minutes 15 minutes 15 minutes 15 minutes <br /> starting test <br /> Test Start Time: 2:24pm 2:24pm <br /> Initial Reading(RI): 14.01599 Inches 0.21874 Inches Inches Inches <br /> Test End Time: 2:39pm 2:39prn <br /> Final Reading(RF): 4.01719 Inches 0.21928 Inches Inches Inches <br /> Test Duration: 15 mins 15 mins 15 mins 15 mins <br /> Change in Reading(RF-R,): 0.00120 0.00054 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test Result: Z Pass El Fail Rl Pass 0 Fail 0 Pass El Fail El Pass 0 Fail <br /> Was sensor removed for testing? El Yes 0 No 0 NA V]Yes 0 No El NA 21 Yes El No 0 NA 0 Yes El No 0 NA <br /> Was sensor properly replaced and Z Yes []No [-]NA 0 Yes El No El NA 0 Yes El No 0 NA ®Yes El No 0 NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.