My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:22:11 PM
Creation date
6/3/2020 9:58:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232555_2224 MANTHEY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
in-Tank Gauging/SIR Equipmo 6 <br /> ®Check tldis box if tank gauging is used only for inventory control. <br /> OCheck this box if no tank gauging or SIR equipment is installed. <br /> Complete the fallowin X checklist: <br /> •Yes El No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> •Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ER Yes ❑ No* Was accuracy of system product level readings tested? <br /> 0 Yes El No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> G. Line Leak Detectors(LLD): <br /> El Check this box if LLDs are not installed and disregard the following section. <br /> 0 Yes El No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> F1 N/A (Check all that apply) Simulated leak rate: 0 3 gph; E]0.1 gph; n 0.2 gph. <br /> Yes 0 No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 0 Yes El No* IWas the testing apparatus properly calibrated? <br /> ED Yes F1 No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> [:3 N/A <br /> 0 Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A <br /> F—I Yes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> 10 N/A or disconnected? <br /> El Yes 0 No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> 10 N/A malfunctions or fails a test? <br /> 0 Yes 0 No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> EL Comments: No Deficiencies. <br /> Page 3 of 3 03/01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.