Laserfiche WebLink
SWRCB,,January 2002 Page of <br /> F 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer e1ndustry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ,^essure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Equipment Resolution: <br /> rIMMM <br /> Piping Run# Piping Run# Piping Run# Piping Run# <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: , <br /> Product Stored: <br /> Method and location of <br /> i in -nm isolation: <br /> Wait time between applying <br /> pressure/vacu n Avater and <br /> starting test: .L <br /> Test Start Time: " <br /> Initial Reading(RI): R <br /> Test End Time: <br /> Final Reading(Rr): e17 <br /> Test Duration: �t <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: if Pass ❑Fail Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />