Laserfiche WebLink
Page 2 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer ®Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ®Pressure 0 Vacuum 0 Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run# 87 Piping Run # Piping Run# Piping Run# <br /> Piping Material: FG <br /> Piping Manufacturer: UK <br /> Piping Diameter: 4.0" <br /> Length of Piping Run: 75 <br /> Product Stored: Gas <br /> Method and location of piping- Sump <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min <br /> -starting test: <br /> Test Start Time: 10:50 <br /> Initial Reading(Ri): 5 psi <br /> Test End Time: 11:50 <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hr <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result: Wass 0 Fail CI Pass Gy Fail 0 Pass 0 Fail ❑Pass I_l Fail <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />