My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:34:08 PM
Creation date
6/3/2020 9:58:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\2224\PR0232555\PERMANENT INJUNCTION 7-19-07.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer ®Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: ®Pressure 0 Vacuum 0 Hydrostatic <br /> D Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run# 87 Piping Run # Piping Run# Piping Run# <br /> Piping Material: FG <br /> Piping Manufacturer: UK <br /> Piping Diameter: 4.0" <br /> Length of Piping Run: 75 <br /> Product Stored: Gas <br /> Method and location of piping- Sump <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min <br /> -starting test: <br /> Test Start Time: 10:50 <br /> Initial Reading(Ri): 5 psi <br /> Test End Time: 11:50 <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hr <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result: Wass 0 Fail CI Pass Gy Fail 0 Pass 0 Fail ❑Pass I_l Fail <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.