Laserfiche WebLink
Page 3 of 8 0/r <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer Oindustry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum QHydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: 0.0025 <br /> Sump 87 Sump Sump Sump <br /> Sump Diameter: 42" <br /> Sump Depth: 46" <br /> Sump Material: FG <br /> Height from Tank Top to Top of 21" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 14" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2"over product <br /> penetration <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and O Yes ® No 0 NA O Yes O No ❑NA O Yes O No 13 NA O Yes 0 No O NA <br /> -water)?* <br /> Turbine shutdown response time — <br /> Is system programmed for fail-safe ❑Yes ® No 121 NA 0 Yes ® No 0 NA 0 Yes O No O NA ®Yes O No O NA <br /> shutdown? <br /> Was fail-safe verified to be ❑Yes 0 No 0 NA ❑Yes 13 No O NA O Yes O No ❑ NA O Yes O No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting — <br /> test: <br /> Test Start Time: 9:55 <br /> Initial Reading(Ri): 0.0025 <br /> Test End Time: 10:55 <br /> Final Reading(RF): 0.0025 <br /> Test Duration: 30 min <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 1/16" in an hour <br /> Test Result: " 0 Pass ❑ Fail ❑ Pass ❑Fail ❑ Pass 0'Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? 21 Yes 0 No ®NA ❑Yes ❑No O NA O Yes O No ❑ NA ®Yes O No O NA <br /> Was sensor properly replaced after Yes O No ❑NA O Yes 0 No ®NA O Yes O No O NA ®Yes ❑No O NA <br /> testing? <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to pfly of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />