My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MANTHEY
>
2224
>
2300 - Underground Storage Tank Program
>
PR0232555
>
COMPLIANCE INFO_2007-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2023 4:34:08 PM
Creation date
6/3/2020 9:58:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2015
RECORD_ID
PR0232555
PE
2361
FACILITY_ID
FA0003679
FACILITY_NAME
CALIFORNIA STOP*
STREET_NUMBER
2224
STREET_NAME
MANTHEY
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
16313007
CURRENT_STATUS
01
SITE_LOCATION
2224 MANTHEY RD
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\M\MANTHEY\2224\PR0232555\PERMANENT INJUNCTION 7-19-07.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
446
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 3 of 8 0/r <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer Oindustry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum QHydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: 0.0025 <br /> Sump 87 Sump Sump Sump <br /> Sump Diameter: 42" <br /> Sump Depth: 46" <br /> Sump Material: FG <br /> Height from Tank Top to Top of 21" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 14" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry <br /> Portion of Sump Tested' 2"over product <br /> penetration <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and O Yes ® No 0 NA O Yes O No ❑NA O Yes O No 13 NA O Yes 0 No O NA <br /> -water)?* <br /> Turbine shutdown response time — <br /> Is system programmed for fail-safe ❑Yes ® No 121 NA 0 Yes ® No 0 NA 0 Yes O No O NA ®Yes O No O NA <br /> shutdown? <br /> Was fail-safe verified to be ❑Yes 0 No 0 NA ❑Yes 13 No O NA O Yes O No ❑ NA O Yes O No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting — <br /> test: <br /> Test Start Time: 9:55 <br /> Initial Reading(Ri): 0.0025 <br /> Test End Time: 10:55 <br /> Final Reading(RF): 0.0025 <br /> Test Duration: 30 min <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 1/16" in an hour <br /> Test Result: " 0 Pass ❑ Fail ❑ Pass ❑Fail ❑ Pass 0'Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? 21 Yes 0 No ®NA ❑Yes ❑No O NA O Yes O No ❑ NA ®Yes O No O NA <br /> Was sensor properly replaced after Yes O No ❑NA O Yes 0 No ®NA O Yes O No O NA ®Yes ❑No O NA <br /> testing? <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> 'If the entire depth of the sump is not tested,specify how much was tested. If the answer to pfly of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.