Laserfiche WebLink
GUST Monitoring Site Plan <br /> . . . . . Regular Tank Premium Tank Diesel Tank . . . . <br /> uAnnular 0 0 0 Tan <br /> Coaxial !t L1 <br /> Regular Sump <br /> Regular a <br /> nula <br /> L2 R4 <br /> r <br /> Tank suet L3u Sump <br /> . . . . . . _4 Super Annular <br /> LL5 <br /> . . . .i !Sump <br /> Lae er eel r i ! <br /> Annular <br /> . . . . . . Panel in office Turbine sump <br /> Dispenser 1 <br /> Quick Cent (the only one with <br /> installed underDiesel) <br /> DL-43enser 1&2 Sensor L9 <br /> Dispenser 4 <br /> . Sensor L1fl . . . <br /> Dispenser 6 <br /> Sensor t_11 • - - <br /> . . . . . Dispenser7 8 <br /> Sensor L.1 <br /> Date map tvas drawn or revised: <br /> Instructions <br /> If you already have a diagram (e.g. your Hazardous Materials usiness Plan Site :Plan/Storage Map) which <br /> shows all required information, you may include it, rather than this page, with this monitoring plan. On your <br /> site plan, show the general layout of tanks and piping in relation to nearby buildings or other structures. .Clearly <br /> identify locations of the following equipment, if installed: monitoring system control panels; mechanical or <br /> electronic line leak detectors; sensors monitoring tank annular spaces, sumps, trench systems, under-dispenser <br /> containment, or other secondary containment areas; and, if ATG is required, in-tank liquid level probes. In the <br /> space provided, note the date the drawing was prepared. <br /> UN-022A-5!6 vrYm.un1docs.or2 Rev.10/1410.3 <br />