Laserfiche WebLink
SWRCB,January 2002 Page 1. <br /> Secondt Containment Testing ReAt Form <br /> This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the <br /> appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and <br /> printouts from tests(if applicable),should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1. FACILITY INFORMATION <br /> Facility Name: CHEVRON 201761 Date of Testing: 10/21/2010 <br /> Facility Address: 1103 S. MAIN ST. PERMIT NUMB. N-3315, MANTECA, CA, 95337 <br /> Facility Contact: MGR - MARIE Phone: (2 0 9) 825-0174 <br /> Date Local Agency Was Notified of Testing <br /> Name of Local Agency Inspector(if present during testing): none <br /> 2. TESTING CONTRACTOR INFORMATION <br /> Company Name: TANKNOLOGY, INC. <br /> Technician Conducting Test: JARROD COOKE <br /> Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester <br /> License Type: a I License Number: 743160 <br /> Manufacturer Training <br /> Manufacturer Component(s) Date Training Expires <br /> tanknology all 07/17/2011 <br /> 3. SUMMARY OF TEST RESULTS <br /> Not Repairs Not Repair <br /> ss <br /> Component Pass Fail Tested Made Component Pass Fail Tested Made <br /> Tank Annular 2 REG ❑ ❑ ❑ UDC 7/8 ❑ Efl ❑ ❑ <br /> Tank Annular 3 REG X ❑ ❑ ❑ UDC 9/10 E ❑ El ❑ <br /> Tank Annular 1 SUP El 1 <br /> ❑ ❑ ❑ UDC 11/12 X ❑ ❑ ❑ <br /> Secondary Pipe 2 REG REGTWO El ❑ ❑ ❑ UDC 7/8 El ❑ ❑ ❑ <br /> Secondary Pipe 3 REG X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Secondary Pipe 1 SUP SUP � ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump 2 REG X ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> Piping Sump 3 REG El ❑ ❑ ❑ ❑ ❑ E ❑ <br /> Piping Sump 1 SUP E ❑ ❑ ❑ El 01 E <br /> UDC 1/2 a ❑ ❑ ❑ ❑ ❑ ❑ ELI <br /> UDC 3/4 0 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> UDC 5/6 ❑ ❑ ❑ ❑ ❑ ❑ ❑ <br /> If hydrostatic testing was performed,describe what was done with the water after completion of tests: <br /> taken water dog <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> To the best of my knowledge, the <br /> e/facts stated in this document are accurate and in full compliance with legal requirements <br /> Technician's Signature: Date: 10/21/2010 <br />