Laserfiche WebLink
SWRCB,January 2002 Page 2 <br /> 4. TANK ANNULAR TESTING 10 <br /> Test Method Developed By: ❑ Tank Manufacturer F-1 Industry Standard Professional Engineer <br /> Other (Spec) <br /> Test Method Used: FI Pressure ❑ Vacuum Hydrostatic <br /> E] Other (Specify) <br /> Test Equipment Used: gauge Equipment Resolution: .2 0" <br /> Tank# 2 REG Tank# 3 REG Tank# 1 SUP Tank# <br /> Is Tank Exempt From Testing?1 Yes Yes X No Yes X No Yes No <br /> X No <br /> Tank Capacity: 12,000 12,000 12, 000 <br /> Tank Material: DW FIBERG DW FIBERG DW FIBERG <br /> Tank Manufacturer: unknown unknown unknown <br /> Product Stored: REGULAR REGULAR SUPREME <br /> Wait time between applying <br /> pressure/vacuum/water and 5min 5min 5min <br /> starting test: <br /> Test Start Time: 9:30 9:30 9:30 <br /> Initial Reading(Ri): loll 1011 10" <br /> Test End Time: 10:30 10:30 10:30 <br /> Final Reading(RF ): <br /> 10" 10" 10" <br /> Test Duration: lhr 1hr lhr <br /> Change in Reading(RF-I I ): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 211 2" 211 <br /> r77-Was sensor removed for testing? Yes X N NA Yes flNoNA Yes X N NA Yes N NA <br /> Was sensor properly replaced and n NA ❑Yen N �Nc� A ❑Ye❑N <br /> verified fnctional after testing? ❑Ye N a❑NA� � <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23, Section 2637(a)(6)) <br />