Laserfiche WebLink
SWRCB,January 2002 Page 4. <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: F-1 Sump Manufacturer F-1 Industry Standard ❑X Professional Engineer <br /> Other (Sped) <br /> Test Method Used: FI Pressure ❑ Vacuum Hydrostatic <br /> Other (Specify) <br /> Test Equipment Used: 7p 1 t Equipment Resolution: +-.0 0 2" <br /> Sump# 2 REG Sump# 3 REG Sump# 1 SUP Sump# <br /> Sump Diameter: 4811 4811 4 8" <br /> Sump Depth: 81" 81" 81" <br /> Sump Material: fiberglass fiberglass fiberglass <br /> Height from Tank Top to Top of 1511 1511 15" <br /> Highest Piping Pentration: <br /> Height from Tank Top to Lowest 20" 2011 20" <br /> Electrical Pentration: <br /> Condition of sump prior to testing: good good good <br /> Portion of Sump Tested: 1 1711 1711 17" <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ayes❑No❑N ayes�No❑N ayes❑N�N F]Yes❑No�i <br /> product and water)?* <br /> Turbine shutdown response time: 2-5s e c 2-5 s e c 2-5 s e c <br /> Is system programmed for fail-safe ---'Yes <br /> Yes❑NN ❑Y ❑ <br /> No <br /> shutdown?* ❑Yes❑N N X Yes❑N X <br /> Was fail-safe verified to be ayes oN�N ayes�No❑N oyes�No❑N ---'Yes❑No❑N <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min <br /> test: <br /> Test Start Time: 10:36 9:34 9:34 <br /> Initial Reading(Rl): 0 0 0 <br /> Test End Time: 11:06 10:04 10:04 <br /> Final Reading(RF): -.000211 -.0010" -.00051, <br /> Test Duration: 3 Omin 3 Omin 3 Omin <br /> Change in Reading(R F-Rl ): - .000211 -.0010" - .000511 <br /> Pass/Fail Threshold or Criteria: +-.00211 +-.00211 +-.00211 <br /> EM <br /> Was sensor removed for testing? FX YesL_]N NA aYes No❑NA X Yes No❑NA E]Yes <br /> ON <br /> Was sensor properly replaced and [JAN <br /> N NA ❑YeoN :]NA ❑Ye�N�NA[]Yes <br /> verified fnctional after testing? EYes1:1 J <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> 1 If the entire depth of the sump is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />