Laserfiche WebLink
SWRCB,.January 2002 Page 5. <br /> 7. UNDER- ISPENSER CONTAINMENT (UDArESTING <br /> Test Method Developed By: F] UDC Manufacturer F-1 Industry Standard ❑X Professional Engineer <br /> ❑ Other (Spec) <br /> Test Method Used: ❑ Pressure Vacuum Hydrostatic <br /> ❑ Other (Specify) <br /> Test Equipment Used: vp 1 t Equipment Resolution: +-.0 0 2" <br /> UDC# 1/2 UDC# 3/4 UDC# 5/6 UDC# 7/8 <br /> UDC Manufacturer: unknown unknown unknown unknown <br /> UDC Material: fiberglass fiberglass fiberglass fiberglass <br /> UDC Depth: 36" 36" 36" 36" <br /> Height from UDC Top to Top of 1111 1111 11" 1111 <br /> Highest Piping Pentration: <br /> Height from UDCTop to Lowest 911 911 911 91, <br /> Electrical Pentration: <br /> Condition of UDC prior to testing: good good good good <br /> Portion of UDC Tested: 1 1311 1311 1311 1311 <br /> Does turbine shut down when <br /> sump sensor detects liquid(both X❑yes❑No❑N Yes ]No�N Yes❑N�N E Yes❑No❑N <br /> product and water)?* <br /> Turbine shutdown response time: 2-5sec 2-5sec 2-5sec 2-5 s e c <br /> Is system programmed for fail-safe ❑ ❑ ❑ � ❑ <br /> shutdown?* X❑Yes N N X❑Yes N N X❑Yes N N X Yes No <br /> Was fail-safe verified to be ❑ ❑ E] ❑ ❑ � ❑ ❑ � ❑ ❑ n„T <br /> operational?* R Yes N N X Yes N N X Yes N N X Yes No J`� <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5min 5min 5min 5min <br /> test: <br /> Test Start Time: 9:33 10:2 2 11:19 11:24 <br /> Initial Reading(Ri): 0 0 0 0 <br /> Test End Time: 9:48 10:38 11:34 11:34 <br /> Final Reading(RF): - .000611 - .0004" -.00081, -.2606" <br /> Test Duration: 15min 15min 15min 15min <br /> Change in Reading(RF-Rl ): -.000611 -.0004" -.000811 - .2606" <br /> Pass/Fail Threshold or Criteria: +-.002" +-.002" +-.002" +-.002" <br /> son= <br /> Was sensor removed for testing? X JN4 Yes No� � <br /> Was sensor properly replaced and EI,esE]Nc❑NA [flYeC1Nc❑NAMYe f]NcF]NA MYes❑No[]N <br /> verified functional after testing? <br /> Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> disp 7/8 failed at 13" and passed at 6" <br /> 1 If the entire depth of the UDC is not tested,specify how much was tested.If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />