My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2014
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1103
>
2300 - Underground Storage Tank Program
>
PR0232587
>
COMPLIANCE INFO_2011-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 11:31:21 AM
Creation date
6/3/2020 9:58:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2014
RECORD_ID
PR0232587
PE
2361
FACILITY_ID
FA0004521
FACILITY_NAME
CHEVRON USA #201761*
STREET_NUMBER
1103
Direction
S
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95337
APN
21935038
CURRENT_STATUS
01
SITE_LOCATION
1103 S MAIN ST
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0232587_1103 S MAIN_2011-2014.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
457
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Feb, 23. 2015 12: 12PM No. 5148 P, 4 <br /> Page 5 of 14 <br /> 5, SECONDARY PIPE TESTING <br /> Test Method Developed Ey: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: 0 pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Piping Run# 2:2 Piping Run# 2z Piping Run# Piping Run# <br /> Piping Material: <br /> piping Manufacturer <br /> piping Diameter: e ' <br /> Length of Piping Run_ J ' a <br /> Product Stored: c eo"'7 <br /> Method and location of <br /> piping-run isolation: tee., <br /> ENVIRONMENTAL <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes 30 minutes 30 minutes <br /> starting test: <br /> Test,Start Time: A,p z ej <br /> Initial Reading(Rj): psi S psi psi psi <br /> Test End Time: Z-e2 2-1 <br /> Final Reading(Rr): 5 psi psi psi psi <br /> Test Duration: 1 hour 1 hour 1 hour I hour <br /> Change in Reading(RF-Ri): 0 U <br /> Pass/Fail Threshold or 0.00 0.00 0100 0.00 <br /> Criteria: <br /> Test Result;;• ®.]Pass ❑I+ail �'P899.•. .❑FBYI . ❑ .p8S3' ' ❑'F�iI ❑ P�$8, D�A1I'. <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br /> Received Time Feb, 23, 2015 12 : 21PM No, 8181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.