Laserfiche WebLink
Feb;12 3.. 2015 12: 12PM No, 5 14 8 P, 5 <br /> Page 7 of 14 <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed 13y: ❑ Sump Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑ Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: See attached testing procedures Equipment Resolution: <br /> Sump# 7Sump# ,7Sump# 9 / ons <br /> Tr_ <br /> y y <br /> y <br /> Sump Material Manufacturer: „[,e 7 <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration- 17- <br /> Height from Tank Top to lowest 4PVrP 171i` ./ <br /> Electrical Penetration: 'l7- 717, <br /> 2 3 <br /> Condition of sump prior to testing: 6)& <br /> Portion of Sump Tested' Above highest Above highest Above highest Above highest <br /> penetration penetration penetration penetration <br /> Does turbine shut down when <br /> sump sensor detects liquid(both ❑Yes❑No®NA ❑'Yes❑No 0 NA [I Yes❑No®NA ❑Yes❑No®NA <br /> product and water)?" <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?" El Yes ElNo®NA ❑Yes❑No®NA ❑Yes E]No NA [_1 Yes E]No®NA <br /> Was fail-safe verified to be <br /> sfai -safe ❑Yes❑No®NA ❑Yes❑No®NA ❑Yes❑No®NA MYes❑IvoZNA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 30 minutes 30 minutes 30 minutes 30 minutes <br /> test: <br /> Test Start Time: 37 <br /> Z : b <br /> Initial Reading(Rj): /. Z b ®. 7/y z. e, 3 z S <br /> Test]End Time: Z.,12 2 e .3 <br /> Final Reading(RP): 2073 0. 4 7® V 2 , 4.32 2 <br /> Test)Duration: 15 min 15 min 15 Write 15 min <br /> Change in Reading(Rr-R�: r p v ozy O o e_,9 6 ®4,c> 33 <br /> Pass/Fail Threshold or Criteria: 0.002 0.002 0.002 0.002 <br /> Test ReSttlt: �'>Pass. .❑Fail`.' ]"Pais'. ❑`Fail ;Pass ❑:Pail 0 >l'� s''','❑..JFiiil <br /> Was sensor removed for testing? ®Yes❑No❑NA EYes❑No❑NA [9Yes❑No❑NA ❑Yes E]No❑NA <br /> Was sensor properly replaced and 21 <br /> verified functional after testing? <br /> Yes[_1 No❑NA ®Yes ElNo El NA ®Yes ElNo El NA El Yes❑No❑NA <br /> Comments— include information on repairs made prior to testing, and recommended follow-u oi- ailed tests <br /> If the entire depth of the sump is not tested,specify how much was tested. If the answer to aM of the questions indicated with an <br /> Recei'vied*TimeXF,eb. 23, '2015't12721PM-"fVo8181yd- (See SWRCB LG-160) <br />