Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> blONffORING PLAN-(Page I of 2) <br /> TYPE OF ACTION [11.NEW PLAN 2.CHANGE OF INFORMATION 490-1 <br /> PLAN TYPE ❑ 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) IS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> FACILITY <br /> YSTEMS)FACILITY ID#(Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) � % 3'-. Cowl,P ,c <br /> BUSINESS SITE ADDRESS 103' 1 CITY . G /) 104. <br /> f' <br /> II EQUIPI�IENT_TRSTINGAND E <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line teak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> 23 CCR_§26.32.2634y2638 2, 641) <br /> 490.3a <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER <br /> Q (Specify): 490-36 <br /> III M�NITORIIYG LQGA,' IQNS........ <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ❑2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)49D-4 <br /> IV TAI�(K MONS TOR�IYG Is PI*;RFORMD USING TIiI•!FOO,_WI1�G,METHO� $ <br /> ❑ 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY b.LIQUID FILLED ❑ c.PRESSURIZED Eld_.UNDER VACUUM 49°s <br /> -- - - --- - - - - _ -- - ----- ------- ------ <br /> --- <br /> PANEL MANUFACTURER:- � - � �' - - 490 7'j MODEL#: <br /> LEAK SENSOR MANUFACTURER: MODEL#(W41, �3 z0 to <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§26,43)l 190-11 <br /> PANEL MANUFACTURER: 490.11 MODEL#: 490-13 <br /> IN-TANK PROBE MANUFACTURER: _ _ -490-t0-. _MODEL#(S)__ <br /> -------------------------------------------------------------------------------------------- - - --------------------•-- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490.16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): °9x17 <br /> ----------- ------------------- - --- - - ------------------ -- -- --- - -- - -- - - - - - -- - d4---- <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): 490.19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490.20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS 49900.22 <br /> 5.TANK INTEGRITY,TF G(23 CCR§2643.1): 490'23 <br /> TEST FREQUENCY: t(a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHEReci 490-24 <br /> {S P fY)� 490•25 <br /> El99.OTHER (Specify): 490-26 <br /> 490-Z7 <br /> MOMTORIN IS ,ERFORMEI)iJSING I III'<kQI.�OFIVT (G ME'I HODS)(Cheek all that apply) . . <br /> L CONTINUOUS MONITORING OF P E/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-26 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS: DRY ❑b.LIQUID F_[LLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 0-90-29 <br /> PANEL MANUFACTURER: Gy - ------490-30 - MODEL#, ----- - 490.31 <br /> LEAK SENSOR MANUFACTURER: 490 32_ MODEL#(S-,t r- 490.33 <br /> --- ----- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. �a. ES ❑b.NO 490.34 <br /> FAILUREIDISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. YES ❑b.NO 490-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p_h-LEAK TEST AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS 490.36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) - 490-39 <br /> ---------------------------------------------------------------------------------------------------___-------------- ----__-__._.----- <br /> ELLD MANUFACTURER(S) 40 MODEL#S: 490-41 <br /> --------------- - - - ---- - - -- --- __- --- --- --- - ---- �--- - --- -- - ---- - <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 49042 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 49D-43 <br /> ELLD FAILURE/DISCONNfQTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑a.YES ❑b.NO 490'44 <br /> ❑ 4.PIPE INTEGRITY TF,. NG 490-45 <br /> TEST FREQUENCY Q ANNUALLY Cj b.EVERY 3 YEARS ❑ c.OTHER(Specify) 490-46 490.47 <br /> ❑ 5.VISUAL PIPE MONI-MRING. 490-48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> •Allowed ror monitoring of unburied emagmcy gggemor fuel Piping only r HSC 25281.5 b 3 <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTE <br /> 490.51 <br /> ❑ 99.OTHER(Specify) . 53 <br /> UPCF UST-D(12/2007)1/4 <br /> i <br />