Laserfiche WebLink
Mar 24 2009 7: 29PM RAMOS OIL S&C 9163713028 P. 3 <br /> 03/16/2009 MON 7: 51 FAX 209 433 sac ZHD 0 - @0011004 <br /> UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAPI-(fte I of 2) <br /> TYPE OF ACTION ❑1.NEW PLAN 2.CHANGE OF INFORMATION 49o.1 <br /> PLAN TYPE 0 I.YONMRING IS IDSNT(CALFOR ALL LISTS AT THIS FACILITY. / 4001 <br /> (Chack one item*a!y) 2rl.THIS"N 0OVFRS ONLY FOLLOWING UST Symm(S). ......... <br /> 1. FACILITY INFO 'CION <br /> -F1-ke1-1jT-fi5-i(Ax-y Use Only) <br /> BUSINESS NAME(Saone as FACILITY NAME) r�w'jj, e $I:.- <br /> 3. <br /> I ...... <br /> BUSINESS SITE ADDRESS dT 8 11- <br /> toe <br /> 11.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing.Preventive maintamm.andcalibnation of monitoring equiptnent(eg.'semsm,probes,line leak 4eteelms,etc.)tmW be porrownud at the fmqtmwy <br /> specilised by the equipment ananufaclutus'insitummos,or aurnailly,whichova is more fi-equenit,and that such work tumt be performed by qualified personnel. <br /> ..Q31?g.EL2632jA34, <br /> .......... <br /> '=.. 4W)a <br /> MONITORING EQUIPMENT ISSER ICED jjrLANNUALLV 99.OTHER(Specify)- 4W3b <br /> 111.MONITOR(, LOCATIONS <br /> -DI.NEW SITE T PLANINAPSUBMITTED WI-if,THIS PLAN.Jjr7.SITE PLOT PLANIMAP PREVIOUSLY SUBMITTED. (23CCR§202, <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING ME,THOD(S): <br /> L CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR.(INTERSTITIAL)SPACE(&)OR SECONDARY CONTAllNMmvr <br /> VAULTS)WITH AUDIBLE AND VISUAL ALARM$. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: 0 a.DRY LIQUID FILLED 0 c.PRESSURIZED 0 d.UNDER VACUUM <br /> ............ ........» ..._.... ....... <br /> PANEL MANUFACTUREM T'a'71 MODEL N: <br /> ........................ <br /> z----------- <br /> LEAK SENSOR MANUrACTIJR 1 MODEL#($):-73oP 4e- <br /> 0 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL I&MO1.(23 CCR§2643) <br /> PANEL MANUFACTUR M- : MODEL#. 494 t3 <br /> ............. <br /> ---------------------- <br /> IN-TANK PROBE MANUFACTURER: <br /> ..................--- ......... .................... <br /> LEAK TEST FREQUENCY: 0 a.CONTINUOUS 13 b.DAILY/NIGHTLY ❑c.WEEKLY 490-10 <br /> 0 d.MONTHLY OT- �pc ...x........_: 490-17 <br /> ............... ------------------- - <br /> jq <br /> ........................ <br /> iwiF <br /> PROGRAMMED TESTS: 0 a.0.1 gp,h. b.0,2 S.PIL 0 c.OTHER(Specify): 490-19, <br /> ❑ 3,MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2446.1): 41-20 <br /> C1 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§264S). TESTINGPFJt[OD; Oa.36HOURS 0 b.60 mouris 490-21 <br /> -jq5.;12 <br /> 5.TANK I RITY TESTING(23 CCR§2643.1): 490-21 <br /> TESTFREQUENCY, 0 a.ANNUALLY E) b.911ENNIALLY OTHER(Specily): 400-24 <br /> 490.2$ <br /> 99,OTHER(spxify). 4911-M <br /> ........... <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> I0 1.CONTINUOUS MONITORING OF PIPE1 PIPING SUMPS)AND OTHER SECONDARY CONTAINMENT WlITH AUDI=AND <br /> VISUAL ALARM& (23 CCR§2636)- <br /> SECONDARY CONTAINMENT IS: a.DRY Ob.LIQUID FILLED (ju.PRESSURIZED Od.UNDEI(VACUUM -29 <br /> __-•_•__._ .__^............_._.........._......_........................... .............. <br /> PANEL MANUFACTURER: 4"o MOVELO: -490 OP' 4"-31 <br /> .........................................---------------'-................ ---------------.-...... <br /> 4911-11 <br /> LEAK SENSOR MANUFACTURER: ZZAWeC-W <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. El 0,YES 0 5.NO 44o- <br /> 34 <br /> FAILURMISCONNECTiONOF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. EIAL YES 01).No 490'3$ <br /> 0 Z MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 34 g.pAt.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW VniENA LEMIS DETECTED q3C!ZRJjfL*J. 4 90-36 <br /> t .......... <br /> MLLD MANUFACI`URRR(S) 49009 <br /> 0 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 94161h LEAK TESTS (23 CCR§2636) .9-139 <br /> ...................^........._.......--................. ...... _ <br /> ELLD ILKLS1. 4W41 <br /> . ........................... <br /> PROGRAMMED IN LINS LEAK TEST, 0 j.MINIMUM MONTHLY 0.2a.p,Ix MINIMUM ANNUAL0.I g.p.h. a90 a2 <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. 0 a.YES C3 b.NO 490-43 <br /> ELLD FAILURFJDISCONNBCTIONTRIGOERS AUTOMATIC PUMP SHUTDOWN, ()&YES Q b.NO 490.44 <br /> -0 4.PIPE INT9GRrrYT3ST-RTG4"-4$ <br /> TEST FREOUENCY a.ANNUALLY 0 b.EVERY 3 YEARS 0 v.OTHER(Snecifyj 4"490-47 <br /> Lj <br /> S.VISUAL PIPE MONITORING 4449 <br /> FREQUENCY 0 a.DAILY :0 b.WEEKLY C]C.MIN.MON1111Y&UACtfTimsys•mM OPERATED- *0,49 <br /> *Ara*t4 for HSC IM2811M) <br /> 0 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR 12636(a)(3)1. <br /> -0i.VO REGULATED PIPING PER HEALTH AND SAFETY CODE.DIVISION ZO,CHAPTER 6.7 is tONNEcTuD-mTHz TANK SYSTEM <br /> 1:1 99.OTHER(Specify) X 32 <br /> ...... ................ ........ <br /> UPCIFUST-1)(11=007)IM <br />