Laserfiche WebLink
i <br /> 1 <br /> page of <br /> SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By- X Piping M ❑ 5 ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑v ❑Hydrostatic <br /> ❑ (Specify) <br /> Test Equipment Used Pressure Gauge <br /> Equipment Resolution:0-15 PSI <br /> _717,37 <br /> Piping Run#1 tr Piping Ran#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer. Smith Smith Smith Smith <br /> Piping Diameter. 3" 3„ 3" 3" <br /> Length of Piping Run: 35' 20' 20' 20' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressurelvacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 825 9:47 8:48 10:30 <br /> Initial Reading OW: 5 PSI 5PSI 5 PSI 5 PSI <br /> Test End Time: 9:25 10:47 9:48 11:30 <br /> Final Reading(RF): 5 PSI 5PSI 5 PSI 5 PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-11q): 0 0 0 0 <br /> Pass/Fail Threshold or ® p 0 drop p drop 0 drop <br /> Criteria <br /> Test Result: x Pass O Fail x Psw D Fail x Pass ©Fail x Pass ®Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Installed a new test termination boot in the satellite dispenser 4-5 <br />