My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> 1 <br /> page of <br /> SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By- X Piping M ❑ 5 ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑v ❑Hydrostatic <br /> ❑ (Specify) <br /> Test Equipment Used Pressure Gauge <br /> Equipment Resolution:0-15 PSI <br /> _717,37 <br /> Piping Run#1 tr Piping Ran#2 Piping Run#3 Piping Run#4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer. Smith Smith Smith Smith <br /> Piping Diameter. 3" 3„ 3" 3" <br /> Length of Piping Run: 35' 20' 20' 20' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressurelvacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 825 9:47 8:48 10:30 <br /> Initial Reading OW: 5 PSI 5PSI 5 PSI 5 PSI <br /> Test End Time: 9:25 10:47 9:48 11:30 <br /> Final Reading(RF): 5 PSI 5PSI 5 PSI 5 PSI <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-11q): 0 0 0 0 <br /> Pass/Fail Threshold or ® p 0 drop p drop 0 drop <br /> Criteria <br /> Test Result: x Pass O Fail x Psw D Fail x Pass ©Fail x Pass ®Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> Installed a new test termination boot in the satellite dispenser 4-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.