My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Page of <br /> SWRCB,3anuary 2002 <br /> 5. SECONDARY PIPE TESIING <br /> rTestMethod Developed By: X Pipes ❑ ❑Professional Engineer <br /> Manufacturer <br /> ❑ (Speciffy) <br /> d Used: X ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used. Pressure <br /> . . <br /> Equipment Resolution <br /> GaugeMU =W-1113 <br /> Piping <br /> RAA#5 <br /> Piping Run# Piping Run# Piping Run# <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter. 3" <br /> a <br /> Length of Piping Run: 20' <br /> Product Stored: Diesel <br /> Method and location of Test boot Telt boot Test loot Test hoot <br /> piping-run isolation: <br /> Wait time between applying 5 min 5 min <br /> Pressure/vacuu and 5 min 5 min <br /> starting test: <br /> Test Start Time: 10:30 <br /> Initial Reading 5 PSI <br /> Test End Time: 11:30 <br /> Final Reading(RF): 5 PSI <br /> Test ion: 1 Hour 1 Hour I Hour 1 Hour <br /> Change in Reading(RrRa- 0 <br /> Pass/Fail Threshold or ®drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Result: a Pass ❑Fail ❑ Pais ❑Fait ❑ Pm ❑Fail ❑ Pass ❑Fail <br /> etests) <br /> Comments (include information on repairs made prior to testing and recommended follow-up for tests) <br /> i <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.