My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> SVJRCB,January 2002 <br /> 7. !2TER-DIS.PENSER CONTI AROWNT OJD_q TESTING <br /> I o industry Standard X Professional Engineer <br /> Test Method Developed By. 0 UDC Manufacturer <br /> 0 Other(S0ec�ry) <br /> Test Method Used: 0 Pressure 0 Vacuum X Hydrostatic <br /> 0 Other(Speci <br /> Test Equipment Used-. Caldwell Systems Equipment Resolution .005130 min <br /> M7.77—ITff <br /> — <br /> UDC#4A-5A UDC#5 UDC# UDC# <br /> UDC Manufacturer: Unknown Unknown <br /> UDC Material: FI ass fiberglass <br /> UDC Depth: 36" 36" <br /> Height from UDC Bottom to Top 8" 8" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 6" 6" <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing- <br /> Portion of UDC Tested' 2"above Highest Piping Penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both xYes ONo DNA xYei F-1 No [INA 0 Yes El No DNA 0 Yes 0 No 0 NA <br /> product and water)?' <br /> Turbine shutdown response time <br /> Is system programmed for fail- x Yes 0 No 0 NA x Yes ONo DNA 0 Yes 0 No OKA 0 Yes 0 No 0 NA <br /> safe shutdown?* <br /> Was fail-safe verified to be <br /> operational?* OYes xNo DNA OYes x No Ox NA 0 Yes 0 No DNA 0 Yes 0 No 0 NA <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 5 min 5 min <br /> starting test <br /> Test Start Time: 9:15 9:05 <br /> Initial Reading(R4): .00" .00" .00" .00" <br /> Test End Time: 9.45 9:35 <br /> Final Reading(RF): .00 .00 <br /> Test Duration: 30min 30 min 30 min 30 min <br /> Change in Reading(RF-Rj): .00 .00 <br /> Pass/Fail Tbreshold or Criteria: .005/30 min .005130 min .005/30 min .005/30 min <br /> Test Result x Pass 0 Fail x Pass 0 Fail 0 Pass 0 Fan 0 Pan 0 Fail <br /> Was sensor removed for testing? xYes ONo DNA xYes ONo DNA xYes ONo DNA x Yes 0 No 0 NA <br /> Was sensor properly replaced andx Yes 0 No 0 NA x Yes 0 No 0 NA xYes ONo DNA x Yes 0 No 0 NA <br /> verified functional after I I I <br /> CommentS--(include ip#bimaffon on repairs made prior to testing and recomTLmqedLo�llaw- �for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was's testedL If the answer to My of the questions indicated with an <br /> asterisk(*)is"NO"or"NN"the entire UDC must be ftsted- (See'SWRCBLG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.