My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1995-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_1995-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:45:30 PM
Creation date
6/3/2020 9:58:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995-2011
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_1995-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
471
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page of <br /> SWRCB,January 2002 <br /> 7. UND -_DISPFNSER.00NTAU4MNT QjD9 TESTING <br /> _jR X Professional Engineer <br /> U UDC Manu D industry standard <br /> TestMethodDeveloped By: <br /> Other(2�qecrfy) <br /> Method <br /> :7 0 Vacuum X Hydrostatic <br /> Test MethodUscd* 0 <br /> 0 Other(Specify) <br /> Test Equipment Used. Caldwell Systems ----------- Equipment Resolution. .005/30 min <br /> 7UDC 9 1-2 UDC#2A-3A UDC#34 <br /> f UDC Manufacturer: Unlarown Unknown Unknown <br /> Ft ass Fiberglass Fr ass Fi ass <br /> UDC Material: 38" 38" 38" <br /> 9" 9" <br /> Height from UDC =0 op <br /> of Highest Piping en 6" <br /> Height from UDC Bottom to r 7" <br /> Lowest Electrical Penetration: Dry Dry Dry <br /> Condition of UDC prior to Dry <br /> tesft: Pi Penetration <br /> Portion of UDC Tested —2"above Hi est ping <br /> Does turbine shut down when <br /> UDC sensor detects liquid(box Yes ONO DNA xYes ONo DNA x Yes 0 No 0 NA <br /> (both x Yes 0 No DNA <br /> pLc@gct and water)?* __ <br /> Turbine shutdown resj)onse time <br /> Is system programmed for fail- x Yes ❑0 No ❑DNA xYes: ❑0 No ❑0 NA x Yes ❑0 No 0 NA x Yes 0 No 0 NA <br /> safe shutdown?* — <br /> Was fail-safe verified tbe o 0 Yes x No 0 NA <br /> operational?* i ®Yes x No 0 NA 0 Yes xNo DNA 0 Yes xNo DNA <br /> Wait time between applying 5 min 5 min 5 min <br /> pressure/vacuum/water and 5 min <br /> starting test <br /> Test Start Time: 10:27 — 11:00 10:00 9:22 <br /> Initial Reading(Ri): .00" M .00" .001, <br /> Test End Time: 10:57 11:30 10:30 9:52 <br /> Final Reading(RF): .00 .00 .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-RI}: .00 .00 .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> Test Result x Pass 0 Fail x #ass 0 Fail x Pass 0 Fail x Pass 0 Fail <br /> Was sensor removed for testing? xYes ONo DNA xYes ONo DNA xYes—ONo OKA xYes 0 No DNA <br /> Was sensor properly replaced and <br /> xYes ONo DNA xYes ONo DNA xYes ONo DNA xYes ONo DNA <br /> verified functional after!T!!��, I I I I <br /> Comments—(include information on repairs made prior to testing, and recomme�ndfo�llow-up�for failed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested_ If the answer to my of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.