Laserfiche WebLink
• • <br /> The following is an itemized list of underground storage tank violations that have not <br /> been addressed for RAMOS OIL-FRENCH CAMP as of April 22, 2017. <br /> Open violations from October 29,2015 inspection.;. <br /> Violation #104- UST Operating Permit Application for Facility and Tank information not submitted or <br /> current. <br /> The UST Tank Information form for the diesel tank(TA0505616) is not current in CERS. Primary containment tank <br /> construction, piping construction and piping primary containment, vent primary and secondary containment <br /> construction,, construction, riser pipe primary and secondary <br /> containment construction, vent piping transition sumps construction, and corrosion protection were not provided or <br /> were incorrect. Also the applicant's name on the UST Tank Information form is outdated. Any change of <br /> information must be updated in CERS within 30 days of the changes. Immediately log into CERS, update the <br /> required information, and submit for review by the EHD. <br /> Violation #107 -Plot plan/site map not submitted or failed to completely show where monitoring is <br /> performed. <br /> An accurate UST Monitoring Site Plan was not submitted. Missing are the UDC sensors, annular sensor, and fill <br /> sump sensor. A site plan must be submitted identifying the locations where monitoring will be performed. <br /> Immediately log into the California Environmental Reporting System (CERS) at http://cers.calepa.ca.gov/and upload <br /> a copy of the UST Monitoring Site Plan. <br /> Violation#204-Current monitoring plan approved by the EHD not found on site. <br /> An approved copy of the monitoring plans were not available for inspection. A copy of these plans shall be <br /> accessible on site at all times. Immediately locate and retain a copy on site. <br /> Violation #205 - Monitoring and response plans not current or approved by the EHD. <br /> The monitoring plan is not current and/or not approved by the EHD. The monitor panel manufacturer, monitor panel <br /> model, leak sensor manufacturer, leak sensor model number, continuous monitoring of piping secondary <br /> containment, pipeline integrity testing and frequency, UDC monitoring, UDC panel manufacturer and model number, <br /> UDC leak sensor and model and UDC construction were incomplete or inaccurate. The monitoring system at the <br /> site was changed from an Incon to a Veeder Root monitoring panel and sensors in October 2012. The monitoring <br /> plan must be uploaded to the California Environmental Reporting System (CERS). Immediately log into CERS, <br /> make the necessary changes, and submit for review by the EHD. <br /> Violation #210 - Designated operator monthly inspection reports not maintained on site for at least 12 <br /> months. <br /> The November 2014 and June 2015 designated operator monthly inspection reports were not found on site. The <br /> report found in the June 2015 position was dated both 6/1/15 and 7/30/15, and the attached alarm history was dated <br /> 7/1/15. Designated operator monthly inspection reports for the previous twelve months shall be retained on site. <br /> Locate and ensure that copies of the previous twelve months of designated operator monthly inspection reports are <br /> maintained on site. g <br /> Violation #211 -Designated operator employee training not performed or log not kept. <br /> The designated operator employee training was not performed i�The last date of training was 3/19/2014. <br /> The designated operator shall train facility employees for which he or she is responsible in the proper operation and <br /> maintenance of the UST system once every 12 months. The training shall include, but is not limited to: <br /> 1. Operation of the UST system in a manner consistent with the facility's best management practices <br /> 2. Employee's role with regard to monitoring equipment as specified in the facility's monitoring plan <br /> 3. Employee's role with regard to spills and overfills as specified in the facility's response plan <br /> 4. Name of the contact person(s) for emergencies and monitoring equipment alarms <br /> Ensure that employees have been trained by the designated operator, maintain the list on site, an �-d <br /> s . <br /> Page 2 of 2 <br />