Laserfiche WebLink
1 copy of the response plan will be maintained in the Environmental Compliance binder in the <br /> computer/controls room. <br /> Item 209 <br /> In the future, DO will properly inspect and complete appropriate reporting with alarm histories. EHS will <br /> be checking periodically to ensure proper procedures are being followed. <br /> Item 210 <br /> In the future, DO will properly inspect and complete appropriate reporting with alarm histories. EHS <br /> will be checking periodically to ensure proper procedures are being followed. <br /> Item 211 <br /> DO employee training completed on October 31, 2016. In the future, DO will consistently train <br /> employees annually. <br /> Item 313 <br /> Contractor went to site and tightened fittings. <br />