Laserfiche WebLink
S CB,January 2002 <br /> Page of <br /> 5. SECONDARY <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Sped) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution 0 15 PSI <br /> ... 7777777777777 <br /> 0"N Se4, � Piping Run#5 Piping Run#6 Piping un# Piping un# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 20' 20' <br /> Product Stored: Diesel Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> i in -run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test. <br /> Test Start Time: 8:50 9:15 <br /> Initial Reading(Rt): 5 PSI 5 PSI <br /> Test End Time: 9:50 10:15 <br /> Final Reading(RF): 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour 1 Hour 1 Hour <br /> Change in Reading( F- I): 0 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> TestResult: x Pass ❑Fail x Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Comments (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />