My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
10842
>
2300 - Underground Storage Tank Program
>
PR0505615
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2021 11:43:46 AM
Creation date
6/3/2020 9:58:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0505615
PE
2361
FACILITY_ID
FA0006898
FACILITY_NAME
RAMOS OIL-FRENCH CAMP
STREET_NUMBER
10842
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
FRENCH CAMP
Zip
95231
APN
19333028
CURRENT_STATUS
01
SITE_LOCATION
10842 S HARLAN RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0505615_10842 S HARLAN_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
516
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Y <br /> SWRCB,January 2002 Page of <br /> 7. UNDER-DISPENSER CONTAINMENT TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Systems Equipment Resolution: .005/30 min <br /> UDC#1A UDC#1-2 UDC#2A-3A U C#3-4 <br /> UDC Manufacturer: Unknown Unknown Unknown Unknown <br /> UDC Material: Fiberglass Fiberglass Fiber lass Fiberglass <br /> UDC Depth: 3899 38" 3$99 3899 <br /> Height from UDC Bottom to Top 999 94D 999 8" <br /> of Highest Piping <br /> Penetration: <br /> C94 <br /> Height from DC Bottom to Q99 799 X999 <br /> V <br /> Lowest Electrical Penetration: ® ! l7 <br /> Condition of UDC prior to Dry Dry Dry Dry <br /> testing: <br /> Portion of UDC Tested 2"above Highest Piping Penetration <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> product and water)?' <br /> Turbine shutdown res onse time <br /> Is system programmed for fail- x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> safe shutdown? <br /> Was fail-safe verified to be p Yes x No ❑NA ❑Yes x No ❑NA ❑Yes x No ❑NA ❑Yes x No ❑NA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test <br /> Test Start Time: 10:45 9:50 9/::15 9:(05 <br /> Initial Readin (RI): <br /> .0044 .00" .0049 .0099 <br /> Test End Time: 11:15 10:20 9:45 9:35 <br /> Final Reading(RF : .00 .00 .00 .00 <br /> Test Duration: 30 min 30 min 30 min 30 min <br /> Change in Reading(RF-Rj): .00 .00 .00 .00 <br /> Pass/Fail Threshold or Criteria: .005/30 min .005/30 min .005/30 min .005/30 min <br /> TestResult: x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail x Pass ❑Fail <br /> Was sensor removed for testing? x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> Was sensor properly replaced and x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA x Yes ❑No ❑NA <br /> verified functional after testing? <br /> O m ma n is—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ' = 1.}. <br /> L <br /> 71 <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to?Lny of the questions indicated with an <br /> asterisk(*)is 66W or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.