Laserfiche WebLink
I <br /> SVTRCB,January 2002 Page of <br /> 5. SECONDARY P11PE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Used: X Pressure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Spec) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-15 PSI <br /> Piping Run# I Piping Run#2 Piping Run#3 Piping Run#4 <br /> Pipin- <br /> g <br /> ing Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Ipm <br /> 7PipmManufacturer: Smith Smith Smith Smith <br /> Piping <br /> Piping <br /> ng Diameter: 31' 3" 3'9 37' <br /> Length of Piping Run: 35' 20' 20' 20' <br /> Product Stored: Diesel Diesel Diesel Diesel <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 8:30 8:35 8:40 8:45 <br /> Initial Reading(Rj): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test End Time: 9:30 9:35 9:40 9:45 <br /> Final Reading(RF): 5 PSI 5 PSI 5 PSI 5 PSI <br /> Test Duration: I Hour I Hour I Hour I Hour <br /> Change in Reading(RF-Rj): 0 0 0 0 <br /> Pass/Fail Threshold or 0 drop 0 drop 0 drop 0 drop <br /> Criteria: <br /> Test Resuft: x Pass 0 Fail x Pass x Fail x Pass 0 Fail x Pass ❑Fail <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> mun: imn <br /> 'KAM'"O ME=0 W-A-M mug <br /> JAN 0 8 2018 <br /> &-I ICRLI" <br /> PER MIT/SEMACES <br />