Laserfiche WebLink
SECONDARY LINE TESTING <br />TestMethod By: 0 Manufacturer • Industry Standard € Professional �ngr. O Other (see below) <br />Test Method UseS: • PressureO Vacuum p Hydrostatic O Other (see below) <br />Measuring Equipment Used: Pressure Gauge (ranged to 10 psig) <br />Descriq#ion Pining Run ON Piaina Run "N' <br />>. Pipe Manufacturer <br />Smith <br />Smith <br />Pipe Type <br />FRP <br />FRP <br />Primary Pipe Diameter (inches) <br />2" <br />2" <br />Secondary Pipe Diameter (inches) <br />3" <br />3" <br />Product Stored <br />Diesel <br />Diesel <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />230' <br />15' <br />(include length of branch runs) <br />Wait time for pressure to stabilize (hr:min) <br />0:36 <br />0:22 <br />Test start time <br />9:52 AM <br />9:51 AM <br />Initial pressure (psig) <br />5 <br />5 <br />Test end time <br />10:52 AM <br />10:51 AM <br />Final pressure (psig) <br />5 <br />5 <br />Test duration (hours:minutes) <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0 <br />0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />Comments: <br />Piping run #3N exits the North sump of tank #3 and serves retail dispenser 3/4 and #7/8. <br />Pioina run #4N is a siphon line <br />between the North sumDs of tanks #3 and #4. <br />0 2002 Walton Engineering, Inc. <br />