Laserfiche WebLink
INSTALLATION CHECKLIST <br />VERIFIED BY: <br />4. WAS AN AIR TEST PERFORMED ON THE PRIMARY TANK? <br />YES NO <br />5. WAS EXCAVATION SIZE AND PREPARATION PERFORMED <br />IN ACCORDANCE WITH SECTIONS 1 AND 2? YES NO <br />6. WAS BEDDING INSTALLED PER SECTION 3? YES NO <br />WHAT TYPE OF BEDDING WAS USED? SAND GRAVEL <br />7. IF HOLDDOWN STRAPS WERE USED, WAS EXPANSION JOINT <br />MATERIAL USED BETWEEN TANK AND HOLDDOWN STRAPS? <br />YES NO <br />S. WAS BACKFILLING DONE IN ACCORDANCE <br />WITH SECTION 3? YES NO <br />9. 1S JOB SITE INA KNOWN HIGH GROUNDWATER AREA? <br />YES NO <br />10. TANK CAPACITY, UL NUMBER, AND NOZZLE CONFIGURATION <br />HAVE BEEN VERIFIED. SEE SECTION 4. YES— NO <br />COMMENTS: <br />AFTER ALL OF THE ABOVE INFORMATION IS COMPLETED, PLEASE RETURN TO <br />TRUSCO TANK INC. THANK YOU. <br />page 2 of 2 <br />P.O. Box 11925, Fresno, CA 93775 (209) 264-4741 <br />revised 2/8/90 <br />