My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:32:59 PM
Creation date
6/3/2020 9:58:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROCEDURE FOR AIR PRESSURE TESTING <br />SUPERTANK"m ANNULAR SPACE <br />In the event local regulating jurisdictions insist on a positive pressure test for the SUPERTANKT"" annular <br />space against Trusco's recommendation, the following procedure must be adhered to or the warranty <br />is invalid. Trusco must be notified of the time and place of the test at least 24 hours in advance of the <br />test and a copy of this form must be completed, signed by all parties, and returned to Trusco <br />immediately upon completion of the test. <br />PRECONDITIONS <br />1. SUPERTANKTM must be backfilled to the top of the tank as shown in Figure 1 (attached). <br />2. Trusco representative must be notified when a SUPERTANKTN1 annulus is required to be pressure tested. <br />3. The valved inlet manifold and valved transfer manifold must each have dual 0-5 psig pressure gages. See Figure 2. <br />4. Maximum air pressure applied to steel primary tank shall be 3.2 psig. <br />5. Maximum air pressure applied to annular space shall be 3 psig. <br />PROCEDURE <br />1. Apply sealant and install plugs, valved outlet manifold, valved inlet manifold with dual 0-5 psig gages and valved transfer <br />manifold with dual 0-5 psig gages as shown in Figure 1. Make sure all manifold valves are closed. <br />2. Start compressor. <br />3. While monitoring the two inlet manifold pressure gages, open the inlet manifold valve and pressurize the primary tank <br />until the inlet manifold pressure gages read between 3 psig and a maximum of 3.2 psig. Close the inlet manifold valve. <br />NOTE : If, while applying air into the primary tank, both gages do not read within 1/2 psig of each other, stop the <br />test by closing the inlet manifold valve, depressurize the primary tank by opening the outlet manifold valve, replace boas <br />cages and start over at step 2 <br />4. Next, while monitoring the two transfer manifold gages, open the transfer manifold valve and pressurize the annular space <br />to a maximum of 3 psig. Close the transfer manifold valve. <br />NOTE : If, while applying air into the annular space, both gages do not read within 1 /2 psig of each other, stop <br />the test by closing the transfer manifold valve, depressurize the annular space by carefully removing one gage, r lace <br />both gages, and start over at step 2- <br />5. Hold pressure for the desired length of time. <br />6. Depressurize by first opening the outlet manifold valve and releasing air until the inlet manifold gages read the same as <br />the transfer manifold gages. Close the outlet manifold valve. Next open the transfer manifold valve and then reopen the <br />outlet manifold valve to purge both the primary tank and the annular space at the same rate. <br />CERTIFICATION <br />The undersigned do hereby certify that the annulus pressure test was performed in strict conformance <br />with this procedure for the SUPERTANKTM listed below. <br />Performed By: <br />Company Name Company Representative Signature <br />Date of Test <br />Witnessed By: <br />Regulator/inspector Signature <br />Title <br />Trusco Order No. <br />Customer P.O. # <br />Tank Owner <br />Installation Address <br />Company Representative Name (Please Print) <br />egulator nspeetor Name (Please Print) <br />egulat(ng Authority <br />Delivery Date <br />U.L Label # <br />Installation Date <br />Revised 1/22/W <br />
The URL can be used to link to this page
Your browser does not support the video tag.