My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:32:59 PM
Creation date
6/3/2020 9:58:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° • <br />B-200'DISPENSER <br />CONTAINMENT/SHUTDOWN SYSTEM <br />RETROFIT AND NEW INSTALLATION INSTRUCTIONS <br />s , <br />• The Bravo B-200 is compatible with all existing primary and secondary piping systems. <br />RmoiTt INsrALLAnw NOT factory installed. <br />Disconnect all electricity. Remove [ Above and below the base of the B-200 box, connect all electrical and vapor <br />® e J <br />existing dispenser(s). • recovery lines to the bulkhead fittings and/or factory installed couplings. <br />• <br />• n Measure length and width of the Connect any U.L. approved flex connector on to the bottom of the product-line <br />.Bravo B-200 containment box. (See s coupling. Rigid fittings can be used for primary and secondary line connections, if <br />Page 4, Diagram 4A.)3desired. <br />Measure existing dispenser opening ""� SECONDARY CONTAIN; IE?�?: Install flexible hose over primary flex line and <br />• . and cut concrete to fit Bravo box / e secure the B-]S fitting and the secondary pipe with a stainless steel clamp. Rigid <br />•° • bottom. Place Bravo box in the opening. piping can also be used. (Refer to the secondary piping system installation instructions <br />(Refer to Page 4 - retrofit instructions.) on Page 7, Diagram 7A.) <br />• <br />Water-leak test ONLY FIELD-INSTALLED penetration fittings. To test for leaks in <br />Neth hsrAt LAnoN Q <br />• • Secure box inside the center of the • penetrations made in the field, fill the base of the box with one-inch of water <br />° island to prevent shifting during the above the penetrations. After a few minutes make a visual inspection for leaks under- <br />s • <br />pouring of the concrete. {Refer to Page 4 <br />, . ® neath the box. If there are no leaks, remove the water with a Bravo siphon pump. <br />• <br />- new installations.) Anchor the dispenser to the Bravo box. Anchoring nuts are installed per manufac- <br />9 s turer's specifications. Connect the telescopic shear valve to the dispenser inlet pip- <br />®• BOTH INSTALLATIONS: ing. Continue with installation instructions on Page 3. Connect electrical and vapor <br />• �For field installation of electrical lines to the dispenser. <br />. and vapor recovery, penetration <br />holes must be cut to accommodate the Seal all field penetrations. The factory-installed conduit penetration should be <br />• correct Bravo bulkhead fittings. Mark on 10s sealed in between the annular space of the conduit and the metal tube with <br />• . the bottom of the box where electrical Chico V or any other equivalent U.L. approved sealing compound. <br />• <br />.� and vapor recovery lines should go and <br />cut holes to accommodate them. (Hole Clear away all debris (pea gravel, dirt, etc.) from the dispenser pan and float <br />perforation sizes are noted on the side of • box. Assure the float chain tension is properly adjusted and connected to the <br />e the B-200 box.) Available sizes for Bravo shear valve and float arm. Manually test the float system with the valve in the open <br />® <br />vapor recovery fittings: 1/2", 3/4", ]", 1- <br />position by gently raising the float tubing up approximately 1/4 to 1/2". (Refer to <br />® 1/2"(see page 7 for bulkhead fittings). Page 3 - Diagram 3-A .) This action should close the shear valve. If liquid test was per- <br />For the electrical use MYE No. 4 (1.1/4" formed, drain the float reservoir through the float tubing by using a Bravo siphon <br />ST) and MYE No. S (1•]/2" ST). Next, pump. <br />• . secure the bulkhead fittings to the bot- PLEASE NOTE: The amount of fluid needed to activate the shear valve trigger is <br />tom of the containment box. (Refer to dependent upon the chain tension. <br />page 7, .4-B.) 12 • <br />Reset the shear valve trip mechanism. <br />PLEASE NOTE: Contractor must per• <br />• form a water-leak test (described in Step RECOMMENDATION: To save on labor and time in removing debris, cover the B-200 <br />R1 if electrical and vapor recovery are box with cardboard, plywood or heavy plastic during installation. <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.