Laserfiche WebLink
EK. <br />_1 1 <br />I I <br />X <br />DISPENSER <br />BASE / OPEN 4 <br />PO S IDN <br />0 <br />1 <br />TEST PLAINT 3 <br />_ TUBING <br />O Q <br />I <br />FLOAT, 6UP SEAL IS FACTORY TESTED - <br />DO NOT REMOVE IT <br />(consult manufacturer <br />before loosening this nut) <br />Diagram 3-A <br />When the B-200 box is in position on the island and the dispenser is in place, the dispenser or pump inlet should be plumb with <br />i <br />e the impact valve. Determine dimension "X" (Diagram 3A) and connect the shear valve and union with a nipple. <br />tThe shear valve must be adjusted vertically by loosening the nuts on the support bracket holding the impact valve to the dis- <br />• penser pan bottom. Loosen the two nuts at the "U" bolt (Diagram 3A, No. 1), and the two nuts at the pan bottom (Diagram 3A, • •' <br />No. 2). Then loosen the primary to secondary sealing nut (Diagram 3A, No. 3) using a chain wrench or other applicable tool. Now the ' <br />entire impact valve assembly is free to move up and down approximately I". <br />30 After the dispenser riser pipe is connected to the impact valve, proceed in the following order: e <br />A. Tightly secure the sealing nut (Diagram 3A, No. 3) taking care not to over -tighten the upper nut. <br />B. Tighten the two "U" clamp nuts (Diagram 3A, No. 1). <br />C. Tighten the two nuts securing the pan. (Diagram 3A, No. 2). <br />• <br />