My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1998-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_1998-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:32:59 PM
Creation date
6/3/2020 9:58:57 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2006
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_1998-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EK. <br />_1 1 <br />I I <br />X <br />DISPENSER <br />BASE / OPEN 4 <br />PO S IDN <br />0 <br />1 <br />TEST PLAINT 3 <br />_ TUBING <br />O Q <br />I <br />FLOAT, 6UP SEAL IS FACTORY TESTED - <br />DO NOT REMOVE IT <br />(consult manufacturer <br />before loosening this nut) <br />Diagram 3-A <br />When the B-200 box is in position on the island and the dispenser is in place, the dispenser or pump inlet should be plumb with <br />i <br />e the impact valve. Determine dimension "X" (Diagram 3A) and connect the shear valve and union with a nipple. <br />tThe shear valve must be adjusted vertically by loosening the nuts on the support bracket holding the impact valve to the dis- <br />• penser pan bottom. Loosen the two nuts at the "U" bolt (Diagram 3A, No. 1), and the two nuts at the pan bottom (Diagram 3A, • •' <br />No. 2). Then loosen the primary to secondary sealing nut (Diagram 3A, No. 3) using a chain wrench or other applicable tool. Now the ' <br />entire impact valve assembly is free to move up and down approximately I". <br />30 After the dispenser riser pipe is connected to the impact valve, proceed in the following order: e <br />A. Tightly secure the sealing nut (Diagram 3A, No. 3) taking care not to over -tighten the upper nut. <br />B. Tighten the two "U" clamp nuts (Diagram 3A, No. 1). <br />C. Tighten the two nuts securing the pan. (Diagram 3A, No. 2). <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.