Laserfiche WebLink
e r / <br />9110fililklifall W''1111 <br />Diagram 7-A <br />B•200 <br />SEAL OFF <br />1.1/2' NIPPLE v CONDUIT <br />MYE <br />B•200 <br />RUBBER SEAL <br />FLAT WASHER <br />LOCKING NUT <br />1' CONDUIT <br />Diagram 7-13 <br />• 8 <br />s <br />• Available sizes and Bravo model num- BULKHEAD FITTINGS INSTALLATION: <br />bers for vapor recovery fittings: 1/2" <br />bens for <br />3/�" (recover, fittings: <br />(BH-1) and With the long end up, place one flat washer and one rubber seal onto the fitting. <br />1-1/2" O, 3/4"2) NFT. <br />• The fixed nut will be on the underside of the box. (Diagram 7-A). <br />• Electrical conduit fittings are available <br />in 1-i/4" ST (MYE No. 9) for 3/d"; 1- insert the fitting through the bottom of the B-200 box. With the stationary nut <br />r n <br />. (short end) down, place one rubber seal and one flat washer onto fitting from <br />i/2" ST (MYE No -S) for 1". Consult <br />the top of the B-200. Thread the remaining nut onto the unit. Tighten the nut to a tension <br />your local BRAVO distributor. <br />• Bulkhead fittings can be used for elec- that prevents leaking. ' <br />tricai penetrations. MYE BULKHEAD FITTINGS INSTALLATION: <br />PLEASE NOTE: All surfaces should be as The MYE fitting is used to provide a continuous conduit run to the electrical seal <br />clean as possible prior to tightening any a off. A threaded 1.1/2" nipple is used to prevent leakage from the B-200 (Diagram <br />bulkhead fittings into place. 7-B). An appropriate sealing material, Chico V or Seal -Off, can be used to seal off the <br />annular space between the nipple and the conduit. Method used should comply with <br />local code requirements. <br />MYE fitting is inserted down from the top of the B-200 box and connects at the <br />• s <br />a bottom of the box to the rubber seal. After inserting the rubber seal (Diagram <br />7B), from the bottom of the B-200, install a flat washer and a locking nut . <br />e <br />