Laserfiche WebLink
, <br /> Page 3 of 8 tom' <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # Piping Run # Piping Run # Piping Run # <br /> Piping Material: <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of piping- <br /> run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> -starting test: <br /> Test Start Time: <br /> Initial Reading(Ri): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: U Pass Cl fall O Pass C1 trait O Pass. O Pail O Pass ❑ Fail <br /> Comments-(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />