My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:41:40 PM
Creation date
6/3/2020 9:59:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> tom' <br /> Page 4 of 8 0& <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: <br /> Sump 3 Sump sump Sump <br /> Sump Diameter: 42" <br /> Sump Depth: 56" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 26„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 7„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry _ <br /> Portion of Sump Tested' 2"Above Product <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and ❑Yes ❑ No ® NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> water)?* <br /> Turbine shutdown response time SEE COMMENT <br /> Is system programmed for fail-safe ❑Yes ❑ No ® NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑Yes ❑ No IM NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 minutes <br /> test: <br /> Test Start Time: 3:20 PM <br /> Initial Reading(Ri): 0.0025 <br /> Test End Time: 3:50 PM <br /> Final Reading(RF): 0.0025 <br /> Test Duration: 30 minutes <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 1/16" hr. <br /> Test Resuft: ® Pass ❑ Fail 0 Pass ❑Fail ❑Pass ❑Fait ❑ Pass ❑Fail <br /> Was sensor removed for testing? IM Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> Was sensor properly replaced after ®Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Turbine Shut Down done during Annual Monitoring Certification. <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to gLny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See S"C13 LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.