Laserfiche WebLink
0 <br /> tom' <br /> Page 4 of 8 0& <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Equipment Resolution: <br /> Sump 3 Sump sump Sump <br /> Sump Diameter: 42" <br /> Sump Depth: 56" <br /> Sump Material: Fiberglass <br /> Height from Tank Top to Top of 26„ <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 7„ <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry _ <br /> Portion of Sump Tested' 2"Above Product <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and ❑Yes ❑ No ® NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> water)?* <br /> Turbine shutdown response time SEE COMMENT <br /> Is system programmed for fail-safe ❑Yes ❑ No ® NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑Yes ❑ No IM NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 minutes <br /> test: <br /> Test Start Time: 3:20 PM <br /> Initial Reading(Ri): 0.0025 <br /> Test End Time: 3:50 PM <br /> Final Reading(RF): 0.0025 <br /> Test Duration: 30 minutes <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 1/16" hr. <br /> Test Resuft: ® Pass ❑ Fail 0 Pass ❑Fail ❑Pass ❑Fait ❑ Pass ❑Fail <br /> Was sensor removed for testing? IM Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> Was sensor properly replaced after ®Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Turbine Shut Down done during Annual Monitoring Certification. <br /> 1 If the entire depth of the sump is not tested,specify how much was tested. If the answer to gLny of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See S"C13 LG-160) <br />