Laserfiche WebLink
0 <br /> Be sure to always READ THE DRAWINGS or plans <br /> to make sure that your mounting points are the <br /> same. Call Bravo Systems if any problem occurs. <br /> - Position and bolt down conversion frame to the dispenser pan using the <br /> anchor plates of the conversion frame with minimum 1/2" Diameter bolts. Use plastic <br /> caps to cover the bolts/nuts. <br /> For Non-Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br /> - Adjust electrical conduits to line up with the new dispenser if necessary. <br /> - Pre-plumb all product inlets and vapor recovery line with offsets and/or rigid <br /> pipe and elbows if necessary. <br /> DEPENDING ON NEW DISPENSER USED AND/OR <br /> OFFSET APPLICATION, THE RISER ON THE DISPENSER MAY <br /> NEED TO BE SHORTENED TO ACCOMMODATE THE SPACE <br /> TAKEN UP BY THE USE OF OFFSETS, ELBOWS, ETC... <br /> J - Position and bolt down the dispenser to the conversion frame with the anchor <br /> bolts provided. <br /> NEW DISPENSER BASE -� <br /> VARIES <br /> BRAVO <br /> CONVERSION FRAME OFFSET <br /> BRAVO <br /> Conversion Anchor Bolt OFFSET <br /> Anchor Plate o <br /> BRAVO BOX <br /> Concrete Anchor BoltFOR OLD <br /> DISPENSER <br /> A <br /> _ 4 <br /> T <br /> .S` <br /> 2 ii-ConversionF rame 1-1.4-08 <br />