My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:41:40 PM
Creation date
6/3/2020 9:59:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> Be sure to always READ THE DRAWINGS or plans <br /> to make sure that your mounting points are the <br /> same. Call Bravo Systems if any problem occurs. <br /> - Position and bolt down conversion frame to the dispenser pan using the <br /> anchor plates of the conversion frame with minimum 1/2" Diameter bolts. Use plastic <br /> caps to cover the bolts/nuts. <br /> For Non-Bravo Sumps - A minimum of Four anchor bolts must be secured directly to concrete. <br /> - Adjust electrical conduits to line up with the new dispenser if necessary. <br /> - Pre-plumb all product inlets and vapor recovery line with offsets and/or rigid <br /> pipe and elbows if necessary. <br /> DEPENDING ON NEW DISPENSER USED AND/OR <br /> OFFSET APPLICATION, THE RISER ON THE DISPENSER MAY <br /> NEED TO BE SHORTENED TO ACCOMMODATE THE SPACE <br /> TAKEN UP BY THE USE OF OFFSETS, ELBOWS, ETC... <br /> J - Position and bolt down the dispenser to the conversion frame with the anchor <br /> bolts provided. <br /> NEW DISPENSER BASE -� <br /> VARIES <br /> BRAVO <br /> CONVERSION FRAME OFFSET <br /> BRAVO <br /> Conversion Anchor Bolt OFFSET <br /> Anchor Plate o <br /> BRAVO BOX <br /> Concrete Anchor BoltFOR OLD <br /> DISPENSER <br /> A <br /> _ 4 <br /> T <br /> .S` <br /> 2 ii-ConversionF rame 1-1.4-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.