My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:41:40 PM
Creation date
6/3/2020 9:59:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTALLATION MATERIALS CHECKLIST <br /> [—] Tools & Equipment offsets, elbows, nipples, unions, Etc.. <br /> E] Concrete Anchor Bolts Plastic caps (sow plugs) for nuts / bolts <br /> S. Bravo Systems, Inc. does not include Concrete Anchor Bolts with its Conversion Frames. <br /> PRE-INSTALLATION CHECKLIST <br /> ❑ Ensure that you have all your permits in order, including your Bravo Certification Card. <br /> ❑ Conversion Frame is free of damage? <br /> ❑ Physically check the Dispenser, Sump and Conversion Frame drawings before installation? <br /> ❑ NO modification to the Conv-Frame is necessary? If so, Call 323-888-4133 immediately. <br /> INSTALLATION CHECKLIST <br /> Dispenser was carefully removed and any spills contained? <br /> E] Drawings for all components are on-site and have been reviewed for any problems? <br /> ❑ Conversion Frame is securely bolted to the existing UDC Sump with minimum 1/2" bolts? <br /> ❑ If OPP or a Non-Bravo Systems UDC is existing, were a minimum of 4 anchor bolts <br /> securely installed directly to the concrete? <br /> ❑ All electrical conduits are adjusted correctly to mate with the new dispenser? <br /> All product inlets are pre-plumbed with approved offsets, elbows, pipe, etc..? <br /> ❑ Conversion Frame was inspected for dents or damage? <br /> Dispenser was carefully lined up and securely bolted to the Conversion Frame? <br /> 3 ii-Conversion Frame 1-14-08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.