My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2009
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3940
>
2300 - Underground Storage Tank Program
>
PR0507837
>
COMPLIANCE INFO_2007-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:41:40 PM
Creation date
6/3/2020 9:59:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2009
RECORD_ID
PR0507837
PE
2361
FACILITY_ID
FA0008057
FACILITY_NAME
TRACY TRUCK AND AUTO STOP
STREET_NUMBER
3940
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95304
APN
21220004
CURRENT_STATUS
01
SITE_LOCATION
3940 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0507837_3940 N TRACY_2007-2009.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 4 of 14 <br /> 8. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer Z Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: Z Pressure ❑Vacuum ❑Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> MEN= Piping Run # 1 Piping Run # 2 Piping Run # 3 Piping Run # 4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 4" 4" 4" 4" <br /> Length of Piping Run: 160' 165' 100' 140' <br /> Product Stored: Prem Reg Diesel Diesel <br /> Method and location of piping- Sump to UDC Sump to UDC Sump to UDC Sump to UDC <br /> run isolation: <br /> Wait time between applying <br /> pressurelvacuum/waterand 5 min 5 min 5 min 5 min <br /> starting test: <br /> Test Start Time: 11:15 AM 11:15 AM 11:15 AM 11:15 AM <br /> Initial Reading(Ri): 5 psi 5 psi 5 psi 5 psi <br /> Test End Time: 12:15 PM 12:15 PM 12:15 PM 12:15 PM <br /> Final Reading(RF): 5 psi 5 psi 5 psi 5 psi <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-Ri): 0 0 0 0 <br /> Pass/Fail Threshold or Criteria: 0 0 0 0 <br /> Test Result: Gl Pass ❑'Fail 0 Pass Q Fail (] Pass l❑ Fail rx1 Pass ❑ Fall <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.