Laserfiche WebLink
Page 5 of 14 <br /> 9. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer 0 Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 2 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Pressure Gauge Equipment Resolution: 0-30 psi <br /> Piping Run # 5 Piping Run # Piping Run # Piping Run # <br /> Piping Material: Fiberglass <br /> Piping Manufacturer: Smith <br /> Piping Diameter: 4" <br /> Length of Piping Run: 10' <br /> Product Stored: Diesel <br /> Method and location of piping- <br /> run isolation: Sump to Sump <br /> Wait time between applying <br /> pressure/vacuum/water and 5 min <br /> starting test: <br /> Test Start Time: 11:15 AM <br /> Initial Reading(Ri): 5 psi <br /> Test End Time: 12:15 PM <br /> Final Reading(RF): 5 psi <br /> Test Duration: 1 hr <br /> Change in Reading(RF-Ri): 0 <br /> Pass/Fail Threshold or Criteria: 0 <br /> Test Result: ® Pass ❑Fail ❑ Pass ❑ Fail ❑ Pass '❑ Fail ❑"Pass ❑ Fait <br /> Comments-(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br />