Laserfiche WebLink
Page 6 of 14 r4AP <br /> P/C <br /> 10. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer IY1 Industry Standard ❑Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑Vacuum EI Hydrostatic <br /> ❑Other(Specify) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: 0.0025 <br /> Sump i Sump 2 Sump 3 Sump 4 <br /> Sump Diameter: 42" 42" 42" 42" <br /> Sump Depth: 56" 56" 56" 56" <br /> Sump Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Height from Tank Top to Top of 18" 18" 18" 18" <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 12" 12" 12" 12" <br /> Electrical Penetration: <br /> Condition of sump prior to testing: Dry Dry Dry Dry <br /> Portion of Sump Tested 2" above product 2" above product 2" above product 2" above product <br /> Does turbine shut down when sump <br /> sensor detects liquid(both product and ❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA ❑Yes ❑ No ® NA ❑Yes ❑ No ® NA <br /> water)?* <br /> Turbine shutdown response time See comment <br /> Is system programmed for fail-safe ❑ Yes ❑ No ® NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA <br /> shutdown?' <br /> Was fail-safe verified to be ❑ Yes ❑ No ® NA ❑Yes ❑ No ❑ NA ❑Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> o erationalT <br /> Wait time between applying <br /> pressure/vacuum/water and starting 5 min 5 min 5 min 5 m i n <br /> test: <br /> Test Start Time: 2:00 PM 2:00 PM 1:00 PM 11:30 AM <br /> Initial Reading(Ri): 0.0025 0.0025 0.0025 0.0025 <br /> Test End Time: 2:30 PM 2:30 PM 2:00 PM 12:00 PM <br /> Final Reading(RF): 0.0025 0.0025 0.0025 <br /> Test Duration: 30 min 30 min 30 min <br /> Change in Reading(RF-Ri): 0 0 0 <br /> Pass/Fail Threshold or Criteria: 1/16 hr 1/16 hr 1/16 hr 1/16 hr <br /> Test Result: [R] Pass ❑ Fait ® Pass ❑ Fail ❑ Pass L7 Fail 91 Pass ❑Fail <br /> Was sensor removed for testing? ® Yes ❑ No ❑ NA ®Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA <br /> Was sensor properly replaced after ®Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA ® Yes ❑ No ❑ NA <br /> testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up for failed tests) <br /> Turbine shut down done during Annual Monitoring certification. <br /> Sump 3 leak possible from 1 of 4 electrical penetration of seam. <br /> ' If the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />