Laserfiche WebLink
Monitoring System Certification <br /> F. In-Tank Gauging/SIR Equipment: 0 Check this box if tank gauging is used only for inventory control. <br /> [3 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perforin leak detection monitoring. <br /> Complete the following checklist: <br /> • Yes [I No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> • Yes 171 No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> [I Yes 0 No* Was accuracy of system product level readings tested? <br /> [I Yes El No* Was accuracy of system water level readings tested? <br /> • Yes El No* Were all probes reinstalled properly? <br /> • Yes 0 No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): E] Check this box if LLDs;are not installed. <br /> Complete the follo ing checklist: <br /> • Yes El No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> 0 N/A (Check all that apply) Simulated leak rate: 0 3 g.p.h.; El 0.1 g.p.h; El 0.2 g.p.h. <br /> • Yes C] No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> • Yes 171 No* Was the testing apparatus properly calibrated? <br /> • Yes to No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> [I N/A <br /> F1 Yes El No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> 0 N/A I <br /> E] Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> N/A or disconnected? <br /> EOYes 0 No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> 0 N/A or fails a test? <br /> [I Yes El No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> 0 N/A <br /> 0 Yes El No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> Comments: <br /> *Mechanical leak detectors were replaced on 87&91-91 leak detector passed the 3 GPH Q10psi testbut 87 leak <br /> detector still not passing the 3QPH test-too much resilance-possiblfty of too much air in the line-Need to purge the line <br /> and will retest the leak detector-Inspector on site for witness test-Will schedule a witness test for the 87 MLLD. <br /> Page 5 of (9 <br />